Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 9/24/2009 PERMIT SUB-TYPE: SNEW PERMIT NO: B09-1753
JOB ADDRESS:
3780 COUNTRY WALK CT
FRISCO, TX
DESC:   6535 AC, 8052 SF, SFR / 2 STORY
OWNER:
PECKHAM CUSTOM BLDG LTD
17480 DALLAS PKWY #219
DALLAS TX 75287

CONTRACTOR:
PECKHAM CUSTOM BLDG LTD
17480 DALLAS PKWY #219
DALLAS TX 75287
ISSUED DATE:
9/24/2009
APPLIED DATE:
9/16/2009
EXPIRED DATE:
3/23/2010
SITE APN:
D613070
STATUS:
COMPLETED
APPLICANT:
PECKHAM CUSTOM BLDG LTD
17480 DALLAS PKWY #219
DALLAS TX 75287
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
487576.35
FEE SUMMARY
INSPECTION SUMMARY
1.5 INCH PD METER$110.00
RESIDENTIAL RED TAG FEE$30.00
PLUMBING FINAL 5/3/2010 12:00:$30.00
PLUMBING FINAL 5/4/2010 12:00:$30.00
THOROUGHFARE IMPACT FEE$3,602.00
WATER IMPACT FEE$1,911.00
SEWER IMPACT FEE$1,553.00
WATER USAGE ON NON FUNCTIONAL$500.00
FIRE DEPT INSPECTION FEES$50.00
WATER METER DEPOSIT$75.00
1 INCH METER$290.00
RESIDENTIAL ELECTRIC FEE$241.56
MISCELLANOUS MECHANICAL FEES$182.00
MISCELLANEOUS PLUMBING FEES$347.00
BUILDING PERMIT FEE$2,933.75
FENCE FEE$20.00
Total Fees:$11,905.31
______  PIER
______  METER PAYMENT
______  SET 1 1/2 PD METER
______  PLUMBING ROUGH-IN
______  SLAB
______  CAMERA
______  BRICK
______  MISCFRAME
______  PLUMBTOPOUT AND MECHRGH
______  ELECTRICAL ROUGH IN
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  MISC FINAL
______  AUTOFIRE SPRK HYDRO
______  AUTOFIRE SPRK VISUAL
______  FIRE FINAL
______  AUTOFIRE SPRK HYDRO
______  AUTOFIRE SPRK VISUAL
______  PLUMBTOPOUT AND MECHRGH
______  LATH
______  MISCFRAME
______  MISCFRAME
______  2NDS/FRAMING
______  BRICK
______  INSULATION
______  DRY WALL
______  WATER REGISTER
______  GAS PRESSURE
______  ELECTRICAL ROUGH IN
______  FLATWORK
______  BACKFLOW
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  PLUMBING FINAL
______  PLUMBING FINAL
______  GAS RELEASE
______  MECHANICAL FINAL
______  CO
______  IRRIGFINAL
______  UTILITY / ROW
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)