|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 8/24/2009
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B09-1583
|
JOB ADDRESS: 12744 HAWKTREE RD FRISCO, TX |
DESC:
5067 AC, 6409 SF, SFR / 2 STORY |
|
OWNER:
DARLING HOMES
2500 LEGACY STE # 100 FRISCO TX 75034
|
CONTRACTOR:
DARLING HOMES
2500 LEGACY STE # 100 FRISCO TX 75034
|
ISSUED DATE: 8/28/2009
APPLIED DATE:8/24/2009
EXPIRED DATE:2/24/2010
SITE APN:D613177
STATUS:COMPLETED
|
|
APPLICANT:
DARLING HOMES
2500 LEGACY STE # 100 FRISCO TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 378048.87
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
RESIDENTIAL RED TAG FEE | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
PLUMBTOPOUT/MEC 11/2/2009 | $30.00 |
THOROUGHFARE IMPACT FEE | $3,602.00 |
WATER IMPACT FEE | $1,911.00 |
SEWER IMPACT FEE | $1,553.00 |
FIRE DEPT INSPECTION FEES | $50.00 |
PLUMBTOPOUT/MEC 11/3/2009 | $30.00 |
RESIDENTIAL ELECTRIC FEE | $192.27 |
MISCELLANOUS MECHANICAL FEES | $142.50 |
MISCELLANEOUS PLUMBING FEES | $274.00 |
BUILDING PERMIT FEE | $2,388.75 |
FENCE FEE | $20.00 |
Total Fees: | $10,588.52 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ INSULATION |
______ PLUMBTOPOUT AND MECHRGH |
______ GAS RELEASE |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL ROUGH IN |
______ AUTOFIRE SPRK HYDRO |
______ AUTOFIRE SPRK VISUAL |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK |
______ INSULATION |
______ DRY WALL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|