Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 7/23/2009 PERMIT SUB-TYPE: SNEW PERMIT NO: B09-1341
JOB ADDRESS:
13544 LYNDHURST DR
FRISCO, TX
DESC:   3603 AC, 4343 SF, SFR / 2 STORY
OWNER:
HIGHLAND HOMES
12850 HILLCREST #200
DALLAS TX 75230

CONTRACTOR:
HIGHLAND HOMES
12850 HILLCREST #200
DALLAS TX 75230
ISSUED DATE:
7/30/2009
APPLIED DATE:
7/20/2009
EXPIRED DATE:
6/26/2011
SITE APN:
C2649941
STATUS:
COMPLETED
APPLICANT:
HIGHLAND HOMES
12850 HILLCREST #200
DALLAS TX 75230
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
268819.83
FEE SUMMARY
INSPECTION SUMMARY
$0.00
CAMERA 01/26/2011 CB$30.00
WATER METER DEPOSIT$75.00
1 INCH METER$290.00
ELECTRICAL ROUGH IN 02/23/2011$30.00
ELECTRICAL ROUGH IN 02/24/2011$30.00
PLUMBING ROUGH-IN 01/17/2011$30.00
PLUMBING ROUGH-IN 01/12/2011$30.00
PLUMBING ROUGH-IN 01/14/2011$30.00
PLUMBTOPOUT/MECHRGH 02/23/2011$30.00
PLUMBTOPOUT/MECHRGH 02/24/2011$30.00
THOROUGHFARE IMPACT FEE$1,967.00
WATER IMPACT FEE$1,911.00
SEWER IMPACT FEE$1,553.00
RESIDENTIAL ELECTRIC FEE$130.29
MISCELLANOUS MECHANICAL FEES$136.00
MISCELLANEOUS PLUMBING FEES$253.00
BUILDING PERMIT FEE$1,838.75
FENCE FEE$20.00
Total Fees:$8,414.04
______  METER PAYMENT
______  T-POLE
______  PLUMBING ROUGH-IN
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  FLATWORK
______  SLAB
______  CAMERA
______  CAMERA
______  PLUMBTOPOUT AND MECHRGH
______  ELECTRICAL ROUGH IN
______  ELECTRICAL ROUGH IN
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  ELECTRICAL ROUGH IN
______  2NDS/FRAMING
______  INSULATION
______  BRICK/WALL TIES
______  DRY WALL
______  BRICK/WALL TIES
______  DRY WALL
______  ELECTRICAL FINAL
______  GAS RELEASE
______  UTILITY / ROW
______  PLUMBING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)