|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 7/14/2009
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B09-1247
|
JOB ADDRESS: 12325 PEACE RIVER DRIVE FRISCO, TX |
DESC:
4150 AC, 4987 SF, SFR / 2 STORY |
|
OWNER:
FIRST TEXAS HOMES
2221 E LAMAR #960 ARLINGTON TX 76006
|
CONTRACTOR:
FIRST TEXAS HOMES
2221 E LAMAR #960 ARLINGTON TX 76006
|
ISSUED DATE: 7/20/2009
APPLIED DATE:7/13/2009
EXPIRED DATE:1/16/2010
SITE APN:
STATUS:COMPLETED
|
|
APPLICANT:
FIRST TEXAS HOMES
2221 E LAMAR #960 ARLINGTON TX 76006
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 309631.5
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
2NDS/FRAMING 9/14/2009 CSW | $30.00 |
PLUMBTOPOUT/MEC 9/1/2009 | $30.00 |
PLUMBTOPOUT/MEC 9/4/2009 | $30.00 |
RESIDENTIAL ELECTRIC FEE | $149.61 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
MISCELLANEOUS PLUMBING FEES | $253.00 |
BUILDING PERMIT FEE | $2,043.75 |
FENCE FEE | $20.00 |
2NDS/FRAMING 9/18/2009 | $30.00 |
UTILITY / ROW 12/9/2009 12:00: | $30.00 |
UTILITY / ROW 1/1/0001 12:00:0 | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
PLUMBING ROUGH- 7/31/2009 | $30.00 |
PLUMBING ROUGH- 8/3/2009 | $30.00 |
PLUMBTOPOUT/MEC 9/8/2009 | $30.00 |
INSULATION 9/24/2009 REED | $30.00 |
DRY WALL 9/29/2009 | $30.00 |
DRY WALL 9/28/2009 | $30.00 |
Total Fees: | $3,327.36 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ DRY WALL |
______ BRICK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ FLATWORK |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|