|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 6/30/2009
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B09-1133
|
JOB ADDRESS: 15172 BULL RUN FRISCO, TX 75035 |
DESC:
3870 AC, 4491 SF, SFR / 2 STORY |
|
OWNER:
FIRST TEXAS HOMES
2221 E LAMAR #960 ARLINGTON TX 76006
|
CONTRACTOR:
FIRST TEXAS HOMES
2221 E LAMAR #960 ARLINGTON TX 76006
|
ISSUED DATE: 7/1/2009
APPLIED DATE:6/29/2009
EXPIRED DATE:12/28/2009
SITE APN:C2543171
STATUS:COMPLETED
|
|
APPLICANT:
FIRST TEXAS HOMES
2221 E LAMAR #960 ARLINGTON TX 76006
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 288740.7
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
ELECTRICAL ROUGH IN 8/11/2009 | $30.00 |
2NDS/FRAMING 8/14/2009 CSW | $30.00 |
DRY WALL 8/26/2009 CSW | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
RESIDENTIAL ELECTRIC FEE | $134.73 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
MISCELLANEOUS PLUMBING FEES | $239.00 |
BUILDING PERMIT FEE | $1,938.75 |
FENCE FEE | $20.00 |
FLATWORK 9/21/2009 | $30.00 |
UTILITY / ROW 10/14/2009 SAG | $30.00 |
PLUMBING ROUGH-IN 7/8/2009 T | $30.00 |
Total Fees: | $3,013.48 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ WATER METER REPLACE |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ DRY WALL |
______ DRY WALL |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|