BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 5/8/2009
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B09-0755
|
JOB ADDRESS: 3301 CROSSBOW DR FRISCO, TX |
DESC:
4513 AC, 5626 SF, SFR / 2 STORY |
|
OWNER:
JPA DEVELOPMENT CORPORATION
5968 TIPPERARY PLANO TX 75093
|
CONTRACTOR:
JPA DEVELOPMENT CORPORATION
5968 TIPPERARY PLANO TX 75093
|
ISSUED DATE: 5/15/2009
APPLIED DATE:5/7/2009
EXPIRED DATE:4/7/2010
SITE APN:D247103
STATUS:COMPLETED
|
|
APPLICANT:
JPA DEVELOPMENT CORPORATION
5968 TIPPERARY PLANO TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 336714.93
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CREDIT CARD FEE | $95.57 |
CONVENIENCE FEE | $2.70 |
CONVENIENCE FEE | $2.70 |
CONVENIENCE FEE | $0.90 |
CONVENIENCE FEE | $0.90 |
SLAB 6/2/2009 CSW | $30.00 |
PLUMBTOPOUT/MEC 7/17/2009 | $30.00 |
PLUMBTOPOUT/MEC 7/23/2009 | $30.00 |
RESIDENTIAL ELECTRIC FEE | $168.78 |
MISCELLANOUS MECHANICAL FEES | $169.00 |
MISCELLANEOUS PLUMBING FEES | $284.00 |
BUILDING PERMIT FEE | $2,178.75 |
FENCE FEE | $20.00 |
PLUMBING FINAL 10/1/2009 | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
CO/BUILDING FIN 10/7/2009 | $30.00 |
PLUMBING FINAL 10/2/2009 | $30.00 |
PLUMBING FINAL 9/28/2009 TRC | $30.00 |
ELECTRICAL ROUGH IN 7/17/2009 | $30.00 |
Total Fees: | $3,528.30 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ SLAB |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ ELECTRICAL FINAL |
______ FLATWORK |
______ GAS RELEASE |
______ PLUMBING FINAL |
______ GAS RELEASE |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|