BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 4/20/2009
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B09-0601
|
JOB ADDRESS: 14672 FOXBRIAR LN FRISCO, TX 75035 |
DESC:
4173 AC, 5019 SF, SFR / 2 STORY |
|
OWNER:
K HOVNANIAN HOMES
5808 W. PLANO PKWY PLANO TX 75093
|
CONTRACTOR:
K HOVNANIAN HOMES
5808 W. PLANO PKWY PLANO TX 75093
|
ISSUED DATE: 4/29/2009
APPLIED DATE:4/17/2009
EXPIRED DATE:10/26/2009
SITE APN:C2645395
STATUS:COMPLETED
|
|
APPLICANT:
K HOVNANIAN HOMES
5808 W. PLANO PKWY PLANO TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 311347.53
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CAMERA 5/22/2009 CB | $30.00 |
2NDS/FRAMING 6/30/2009 CSW | $30.00 |
ELECTRICAL FINAL 8/19/2009 C | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
SLAB 5/20/2009 | $30.00 |
PLUMBING FINAL 9/16/2009 | $30.00 |
RESIDENTIAL ELECTRIC FEE | $150.57 |
MISCELLANOUS MECHANICAL FEES | $142.50 |
MISCELLANEOUS PLUMBING FEES | $274.00 |
BUILDING PERMIT FEE | $2,053.75 |
FENCE FEE | $20.00 |
THOROUGHFARE IMPACT FEE | $4,001.00 |
WATER IMPACT FEE | $1,911.00 |
SEWER IMPACT FEE | $1,553.00 |
PLUMBING ROUGH- 5/13/2009 | $30.00 |
PLUMBING ROUGH- 6/23/2009 | $30.00 |
Total Fees: | $10,680.82 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ CAMERA |
______ CAMERA |
______ PLUMBING ROUGH-IN |
______ ELECTRICAL ROUGH IN |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ PLUMBING TOP OUT |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|