|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 2/25/2009
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B09-0212
|
JOB ADDRESS: 15400 LOOKOUT FRISCO, TX |
DESC:
5722 AC, 8885 SF, SFR / 2 STORY |
|
OWNER:
CLAYTON KENNEDY CONSTRUCTION
9607 REDONDO DALLAS TX 75218
|
CONTRACTOR:
CLAYTON KENNEDY CONSTRUCTION
9607 REDONDO DALLAS TX 75218
|
ISSUED DATE: 3/3/2009
APPLIED DATE:2/9/2009
EXPIRED DATE:8/30/2009
SITE APN:C2542408
STATUS:COMPLETED
|
|
APPLICANT:
CLAYTON KENNEDY CONSTRUCTION
9607 REDONDO DALLAS TX 75218
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 426918.42
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMBTOPOUT/MEC 11/20/2009 | $30.00 |
CONVENIENCE FEE | $3.60 |
2NDS/FRAMING 1/13/2010 | $30.00 |
WATER METER DEPOSIT | $75.00 |
1.5 INCH PD METER | $400.00 |
1.5 INCH WATER TAP | $626.00 |
CREDIT CARD FEE | $0.90 |
CREDIT CARD FEE | $1.80 |
CREDIT CARD FEE | $0.90 |
CREDIT CARD FEE | $0.90 |
CREDIT CARD FEE | $0.90 |
CREDIT CARD FEE | $1.80 |
INSULATION 2/4/2010 | $30.00 |
PLUMBTOPOUT/MEC 12/14/2009 | $30.00 |
PLUMBTOPOUT/MEC 12/22/2009 | $30.00 |
PLUMBING FINAL 11/19/2010 JTH | $30.00 |
FIRE DEPT INSPECTION FEES | $50.00 |
RESIDENTIAL RED TAG FEE | $30.00 |
INSULATION 1/28/2010 | $30.00 |
PLUMBING ROUGH- 5/19/2009 | $30.00 |
PLUMBING ROUGH- 5/15/2009 | $30.00 |
2NDS/FRAMING 1/6/2010 | $30.00 |
ELECTRICAL ROUG 12/22/2009 | $30.00 |
FENCE FEE | $20.00 |
BUILDING PERMIT FEE | $2,628.75 |
MISCELLANEOUS PLUMBING FEES | $312.00 |
MISCELLANOUS MECHANICAL FEES | $175.50 |
RESIDENTIAL ELECTRIC FEE | $226.68 |
PLUMBTOPOUT/MEC 12/31/2009 | $30.00 |
CO/BUILDING FINAL 11/29/2010 | $30.00 |
CREDIT CARD FEE | $1.80 |
T-POLE 3/5/2009 | $30.00 |
INSULATION 2/10/2010 | $30.00 |
CREDIT CARD FEE | $1.80 |
Total Fees: | $5,008.33 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ T-POLE |
______ PIER |
______ PIER |
______ SET 1 1/2 PD METER |
______ FOOTINGS |
______ MISC SLAB |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ MECHANICAL |
______ SLAB |
______ FOOTINGS |
______ SLAB |
______ MISCFRAME |
______ LATH |
______ PLUMBING ROUGH-IN |
______ MISCFRAME |
______ CAMERA |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ MISCFRAME |
______ MISCFRAME |
______ MISC PLUMB |
______ PLUMBTOPOUT AND MECHRGH |
______ BRICK |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ BRICK |
______ BRICK |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|