Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 1/6/2009 PERMIT SUB-TYPE: SCHL PERMIT NO: B08-3564
JOB ADDRESS:
4900 LEGENDARY DR
FRISCO, TX
DESC:   143000 SQ FT, SCHL /FISD LAMAR & NORMA HUNT MIDDLE-LEGENDARY
OWNER:
Frisco ISD
6942 Maple St.
Frisco TX 75034

CONTRACTOR:
POGUE CONSTRUCTION-EXP REG
1512 BRAY CENTRAL DRIVE
McKinney TX 75069
ISSUED DATE:
1/13/2009
APPLIED DATE:
10/31/2008
EXPIRED DATE:
7/8/2010
SITE APN:
STATUS:
COMPLETED
APPLICANT:
CORGAN ASSOCIATES, INC
41 N HOUSTON ST
DALLAS TX 75202
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
25000000
FEE SUMMARY
INSPECTION SUMMARY
WATER METER DEPOSIT$75.00
4 INCH COMP METER$2,400.00
PLUMBING ROUGH- 4/9/2009$35.00
FIRE DEPT INSPECTION FEES$225.00
FIRE DEPT INSPECTION FEES$50.00
FIRE DEPT INSPECTION FEES$400.00
FIRE DEPT INSPECTION FEES$2,102.00
GREASE TRAP 9/9/2009$35.00
PLUMBING ROUGH-IN 7/8/2009 R$35.00
PLUMBING ROUGH-IN 7/8/2009 R$35.00
PLUMBING ROUGH-IN 7/9/2009 R$35.00
FIRE INSPECTION FAILED FEE$35.00
PLUMBING ROUGH- 4/7/2009$35.00
MISCELLANEOUS ELECTRICAL FEES$7,203.84
MISCELLANOUS MECHANICAL FEES$4,754.70
MISCELLANEOUS PLUMBING FEES$4,189.00
COMMERCIAL BUILDING PERMIT FEE$48,727.14
PLAN REVIEW FEE$150.00
COMM SLAB 2/17/2009 WKT$35.00
FOOTINGS 3/19/2009 WKT$35.00
SLAB 4/21/2009 WKT$35.00
SLAB 5/15/2009 WKT$35.00
Total Fees:$70,661.68
______  PRECON CONF
______  COMM SLAB
______  PIER
______  PLUMBING ROUGH-IN
______  COMM SLAB
______  PIER
______  PIER
______  PIER
______  PLUMBING ROUGH-IN
______  FOOTINGS
______  FOOTINGS
______  ELECTRICAL ROUGH IN
______  FOOTINGS
______  FOOTINGS
______  PAVING
______  FOOTINGS
______  UNDERGROUND ELEC
______  COMM PLUMB TOP OUT
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  UNDRGR FIRE MAIN VIS
______  FOOTINGS
______  PAVING
______  FOOTINGS
______  PAVING
______  UNDRGR FIRE MAIN HYD
______  COMM SLAB
______  ELECTRICAL ROUGH IN
______  FOOTINGS
______  FOOTINGS
______  T-POLE
______  ELECTRICAL ROUGH IN
______  PLUMBING ROUGH-IN
______  ELECTRICAL ROUGH IN
______  FOOTINGS
______  FOOTINGS
______  T-POLE
______  T-POLE
______  UNDERGROUND ELEC
______  FOOTINGS
______  PLUMBING ROUGH-IN
______  PAVING
______  ELECTRICAL ROUGH IN
______  FOOTINGS
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  FOOTINGS
______  TILT WALL PANELS
______  PLUMBING ROUGH-IN
______  COMM FRAME
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  ELECTRICAL ROUGH IN
______  PLUMBING ROUGH-IN
______  UNDERGROUND ELEC
______  PLUMBING ROUGH-IN
______  TILT WALL PANELS
______  FOOTINGS
______  PAVING
______  UNDERGROUND ELEC
______  SLAB
______  SLAB
______  SLAB
______  PAVING
______  FOOTINGS
______  SLAB
______  PLUMBING ROUGH-IN
______  SLAB
______  FOOTINGS
______  UNDRGR FIRE MAIN VIS
______  SLAB
______  UNDRGR FIRE MAIN HYD
______  SLAB
______  FOOTINGS
______  SLAB
______  SLAB
______  SLAB
______  PLUMBING ROUGH-IN
______  SLAB
______  SLAB
______  COMM SLAB
______  CAMERA
______  SLAB
______  FOOTINGS
______  CAMERA
______  PLUMBING ROUGH-IN
______  BRICK
______  BRICK/WALL TIES
______  SLAB
______  BRICK/WALL TIES
______  LATH
______  SLAB
______  COMM SLAB
______  COMM SLAB
______  SLAB
______  BRICK
______  BRICK
______  ROOF DRAINS
______  ELECTRICAL ROUGH IN
______  COMM FRAME
______  LATH
______  COMM PLUMB TOP OUT
______  PAVING
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  BRICK/WALL TIES
______  BRICK
______  INSULATION
______  LATH
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  COMM PLUMB TOP OUT
______  PLUMBING ROUGH-IN
______  COMM PLUMB TOP OUT
______  MECHANICAL
______  ELECTRICAL ROUGH IN
______  LATH
______  COMM PLUMB TOP OUT
______  COMM FRAME
______  COMM PLUMB TOP OUT
______  BRICK
______  COMM PLUMB TOP OUT
______  ELECTRICAL ROUGH IN
______  BRICK/WALL TIES
______  COMM PLUMB TOP OUT
______  MECHANICAL ROUGH
______  COMM PLUMB TOP OUT
______  INSULATION
______  ELECTRICAL ROUGH IN
______  COMM FRAME
______  INSULATION
______  BRICK/WALL TIES
______  PLUMBING ROUGH-IN
______  COMM PLUMB TOP OUT
______  PLUMBING ROUGH-IN
______  INSULATION
______  COMM PLUMB TOP OUT
______  LATH
______  BRICK/WALL TIES
______  COMM PLUMB TOP OUT
______  INSULATION
______  COMM PLUMB TOP OUT
______  MECHANICAL ROUGH
______  AUTOFIRE SPRK PARTI
______  INSULATION
______  INSULATION
______  COMM PLUMB TOP OUT
______  COMM PLUMB TOP OUT
______  LATH
______  MISCFRAME
______  CEILING
______  COMM PLUMB TOP OUT
______  ELECTRICAL ROUGH IN
______  INSULATION
______  GREASE TRAP
______  GREASE TRAP
______  COMM PLUMB TOP OUT
______  MECHANICAL ROUGH
______  COMM PLUMB TOP OUT
______  INSULATION
______  GREASE TRAP
______  COMM PLUMB TOP OUT
______  GAS AIR TEST
______  COMM PLUMB TOP OUT
______  COMM PLUMB TOP OUT
______  COMM PLUMB TOP OUT
______  COMM PLUMB TOP OUT
______  ELECTRICAL ROUGH IN
______  COMM PLUMB TOP OUT
______  COMM PLUMB TOP OUT
______  COMM PLUMB TOP OUT
______  SIDEWALK
______  COMM PLUMB TOP OUT
______  MECHANICAL ROUGH
______  COMM PLUMB TOP OUT
______  CEILING
______  COMM PLUMB TOP OUT
______  FLATWORK
______  LATH
______  FLATWORK
______  COMM PLUMB TOP OUT
______  COMM PLUMB TOP OUT
______  ELECTRICAL ROUGH IN
______  FLATWORK
______  SLAB
______  CAMERA
______  CAMERA
______  CAMERA
______  ELECTRICAL RELEASE
______  METER PAYMENT
______  4 PD METER
______  UNDRGR FIRE MAIN FLU
______  MECHANICAL ROUGH
______  AUTOFIRE SPRK PARTI
______  CEILING
______  AUTOFIRE SPRK PARTI
______  CEILING
______  CEILING
______  MECHANICAL ROUGH
______  AUTOFIRE SPRK HYDRO
______  AUTOFIRE SPRK VISUAL
______  CEILING
______  DUCT
______  AUTOFIRE SPRK HYDRO
______  AUTOFIRE SPRK VISUAL
______  GREASE TRAP
______  GREASE TRAP
______  CEILING
______  CEILING
______  ELECTRICAL
______  MECHANICAL ROUGH
______  MECHANICAL ROUGH
______  CEILING
______  AUTOFIRE SPRK HYDRO
______  AUTOFIRE SPRK VISUAL
______  INSULATION
______  CEILING
______  AUTOFIRE SPRK HYDRO
______  AUTOFIRE SPRK VISUAL
______  AUTOFIRE SPRK HYDRO
______  AUTOFIRE SPRK HYDRO
______  LANDSCAPE
______  GAS RELEASE
______  AUTOFIRE SPRK HYDRO
______  AUTOFIRE SPRK VISUAL
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  ELECTRICAL FINAL
______  HEALTH FINAL
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  ELECTRICAL FINAL
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  MISC
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  LIFESAFETY
______  AUTOFIRE SPRK VISUAL
______  MISC
______  FIRE FINAL
______  FIRE FINAL
______  BUILDING FINAL
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  BUILDING FINAL
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  FIRE FINAL
______  ELECTRICAL ROUGH IN
______  FIRE FINAL
______  FIRE FINAL
______  COMM CO
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)