|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 11/3/2008
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B08-3556
|
JOB ADDRESS: 12991 ADELA DR FRISCO, TX 75035 |
DESC:
3104 AC, 3645 SF, SFR / 2 STORY |
|
OWNER:
CHOICE HOMES X4/09
5325 FAA BLVD STE 100A IRVING TX 75061
|
CONTRACTOR:
CHOICE HOMES X4/09
5325 FAA BLVD STE 100A IRVING TX 75061
|
ISSUED DATE: 11/7/2008
APPLIED DATE:10/30/2008
EXPIRED DATE:5/6/2009
SITE APN:C2587499
STATUS:COMPLETED
|
|
APPLICANT:
CHOICE HOMES X4/09
5325 FAA BLVD STE 100A IRVING TX 75061
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 231589.44
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
PLUMBING TOP OU 1/2/2009 | $30.00 |
RESIDENTIAL ELECTRIC FEE | $109.35 |
MISCELLANOUS MECHANICAL FEES | $123.00 |
MISCELLANEOUS PLUMBING FEES | $204.00 |
BUILDING PERMIT FEE | $1,653.75 |
FENCE FEE | $20.00 |
SLAB 11/17/2008 | $30.00 |
2NDS/FRAMING 1/12/2009 | $30.00 |
UTILITY / ROW 7/1/2009 KB | $30.00 |
ELECTRICAL FINA 6/25/2009 | $30.00 |
Total Fees: | $2,625.10 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ FLATWORK |
______ CAMERA |
______ T-POLE |
______ ELECTRICAL ROUGH IN |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ MECHANICAL FINAL |
______ UTILITY / ROW |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|