|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 10/30/2008
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B08-3544
|
JOB ADDRESS: 9678 PLANTERS ROW FRISCO, TX |
DESC:
2845 AC, 3319 SF, SFR / 2 STORY |
|
OWNER:
ASHTON WOOD HOMES
8111 LBJ FREEWAY SUITE 1500 DALLAS TX 75251
|
CONTRACTOR:
ASHTON WOOD HOMES
8111 LBJ FREEWAY SUITE 1500 DALLAS TX 75251
|
ISSUED DATE: 12/4/2008
APPLIED DATE:10/29/2008
EXPIRED DATE:6/2/2009
SITE APN:D300926
STATUS:COMPLETED
|
|
APPLICANT:
ASHTON WOOD HOMES
8111 LBJ FREEWAY SUITE 1500 DALLAS TX 75251
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 212265.45
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMBING TOP OUT 6/18/2009 C | $30.00 |
CONVENIENCE FEE | $3.60 |
CONVENIENCE FEE | $3.60 |
CONVENIENCE FEE | $0.90 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
ELECTRICAL ROUG 6/17/2009 | $30.00 |
INSULATION 6/30/2009 GLQ | $30.00 |
PLUMBING FINAL 8/19/2009 | $30.00 |
RESIDENTIAL ELECTRIC FEE | $99.57 |
MISCELLANOUS MECHANICAL FEES | $123.00 |
MISCELLANEOUS PLUMBING FEES | $197.00 |
BUILDING PERMIT FEE | $1,558.75 |
FENCE FEE | $20.00 |
ELECTRICAL FINA 8/20/2009 | $30.00 |
UTILITY / ROW 9/16/2009 KB | $30.00 |
CAMERA LHG | $30.00 |
THOROUGHFARE IMPACT FEE | $1,952.00 |
WATER IMPACT FEE | $388.00 |
SEWER IMPACT FEE | $523.00 |
CO/BUILDING FIN 10/20/2009 | $30.00 |
PLUMBING ROUGH- 4/21/2009 | $30.00 |
Total Fees: | $5,504.42 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|