|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 10/10/2008
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B08-3378
|
JOB ADDRESS: 3979 BAL HARBOUR FRISCO, TX |
DESC:
4209 AC, 4876 SF, SFR / 2 STORY |
|
OWNER:
SHADDOCK HOMES, LTD
2400 DALLAS PKWY, STE 560 PLANO TX 75093
|
CONTRACTOR:
SHADDOCK HOMES, LTD
2400 DALLAS PKWY, STE 560 PLANO TX 75093
|
ISSUED DATE: 4/15/2009
APPLIED DATE:10/2/2008
EXPIRED DATE:10/12/2009
SITE APN:D288740
STATUS:COMPLETED
|
|
APPLICANT:
SHADDOCK HOMES, LTD
2400 DALLAS PKWY, STE 560 PLANO TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 314033.49
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMBING FINAL 7/10/2009 | $30.00 |
PLUMBING FINAL 7/13/2009 | $30.00 |
BUILDING PERMIT FEE | $2,068.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS ELECTRICAL FEES | $146.28 |
MISCELLANEOUS PLUMBING FEES | $246.00 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
PLUMBING ROUGH- 4/20/2009 | $30.00 |
PLUMBING TOP OU 5/18/2009 | $30.00 |
2NDS/FRAMING 5/26/2009 | $30.00 |
1 INCH METER | $290.00 |
WATER METER DEPOSIT | $75.00 |
INSULATION 6/2/2009 CSW | $30.00 |
CONVENIENCE FEE | $1.80 |
CONVENIENCE FEE | $3.60 |
Total Fees: | $3,167.43 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ LATH |
______ PLUMBING TOP OUT |
______ ELECTRICAL ROUGH IN |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|