|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 9/17/2008
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B08-3219
|
JOB ADDRESS: 13803 FALL HARVEST FRISCO, TX |
DESC:
2128 AC, 2589 SF, SFR / 1 STORY |
|
OWNER:
DR HORTON
1901 ASCENSION BLVD.,#100 ARLINGTON TX 76006
|
CONTRACTOR:
DR HORTON
1901 ASCENSION BLVD.,#100 ARLINGTON TX 76006
|
ISSUED DATE: 9/24/2008
APPLIED DATE:9/11/2008
EXPIRED DATE:3/23/2009
SITE APN:D288211
STATUS:COMPLETED
|
|
APPLICANT:
DR HORTON
1901 ASCENSION BLVD.,#100 ARLINGTON TX 76006
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 158770.08
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CONVENIENCE FEE | $2.40 |
CONVENIENCE FEE | $0.90 |
1 INCH METER | $290.00 |
WATER METER DEPOSIT | $75.00 |
FENCE FEE | $20.00 |
BUILDING PERMIT FEE | $1,288.75 |
MISCELLANEOUS PLUMBING FEES | $195.00 |
MISCELLANOUS MECHANICAL FEES | $96.50 |
RESIDENTIAL ELECTRIC FEE | $77.67 |
CO/BUILDING FIN 12/1/2009 | $30.00 |
UTILITY / ROW 11/20/2009 KB | $30.00 |
UTILITY / ROW 11/20/2009 KB | $50.00 |
UTILITY / ROW 10/30/2009 KB | $30.00 |
SET 1 PD METER 4/28/2009 BS | $30.00 |
2NDS/FRAMING 6/18/2009 REED | $30.00 |
Total Fees: | $2,246.22 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ FLATWORK |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ MECHANICAL FINAL |
______ MECHANICAL FINAL |
______ MECHANICAL FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|