Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 9/16/2008 PERMIT SUB-TYPE: SNEW PERMIT NO: B08-3217
JOB ADDRESS:
13849 STEVENS POINT
FRISCO, TX
DESC:   *DUPLICATE*3030 AC, 3526 SF, SFR / 2 STORY
OWNER:
DR HORTON
1901 ASCENSION BLVD.,#100
ARLINGTON TX 76006

CONTRACTOR:
DR HORTON
1901 ASCENSION BLVD.,#100
ARLINGTON TX 76006
ISSUED DATE:
9/24/2008
APPLIED DATE:
9/11/2008
EXPIRED DATE:
3/23/2009
SITE APN:
D288188
STATUS:
COMPLETED
APPLICANT:
DR HORTON
1901 ASCENSION BLVD.,#100
ARLINGTON TX 76006
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
226068.3
FEE SUMMARY
INSPECTION SUMMARY
RESIDENTIAL ELECTRIC FEE$105.78
MISCELLANOUS MECHANICAL FEES$123.00
MISCELLANEOUS PLUMBING FEES$211.00
BUILDING PERMIT FEE$1,628.75
FENCE FEE$20.00
1 INCH METER$290.00
WATER METER DEPOSIT$75.00
Total Fees:$2,453.53
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  MECHANICAL FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)