Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 9/15/2008 PERMIT SUB-TYPE: SNEW PERMIT NO: B08-3203
JOB ADDRESS:
14811 MYRTLE BEACH LN
FRISCO, TX 75070
DESC:   4321 AC, 5331 SF, SFR / 2 STORY
OWNER:
FIRST TEXAS HOMES
2221 E LAMAR #960
ARLINGTON TX 76006

CONTRACTOR:
FIRST TEXAS HOMES
2221 E LAMAR #960
ARLINGTON TX 76006
ISSUED DATE:
9/18/2008
APPLIED DATE:
9/10/2008
EXPIRED DATE:
7/15/2009
SITE APN:
C2642067
STATUS:
COMPLETED
APPLICANT:
FIRST TEXAS HOMES
2221 E LAMAR #960
ARLINGTON TX 76006
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
322389.81
FEE SUMMARY
INSPECTION SUMMARY
SET 1 PD METER BS$30.00
WATER METER DEPOSIT$75.00
1 INCH METER$290.00
PLUMBING FINAL 12/4/2008$30.00
RESIDENTIAL ELECTRIC FEE$159.93
MISCELLANOUS MECHANICAL FEES$136.00
MISCELLANEOUS PLUMBING FEES$253.00
BUILDING PERMIT FEE$2,108.75
FENCE FEE$20.00
FLATWORK 11/21/2008$30.00
THOROUGHFARE IMPACT FEE$4,001.00
WATER IMPACT FEE$1,911.00
SEWER IMPACT FEE$1,553.00
Total Fees:$10,597.68
______  METER PAYMENT
______  SET 1 PD METER
______  SET 1 PD METER
______  T-POLE
______  PLUMBING ROUGH-IN
______  SLAB
______  CAMERA
______  PLUMBING TOP OUT
______  ELECTRICAL ROUGH IN
______  ELECTRICAL ROUGH IN
______  2NDS/FRAMING
______  INSULATION
______  BRICK
______  DRY WALL
______  FLATWORK
______  FLATWORK
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  PLUMBING FINAL
______  UTILITY / ROW
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)