Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 8/22/2008 PERMIT SUB-TYPE: SNEW PERMIT NO: B08-3024
JOB ADDRESS:
1050 TWIN HARBORS DR
FRISCO, TX 75034
DESC:   5024 AC, 6040 SF, SFR / 2 STORY
OWNER:
REDUS TEX HOMES LLC
301 SOUTH COLLEGE
CHARLOTTE NC 28288

CONTRACTOR:
DUNHILL HOMES
2100 MCKINNEY AVE
DALLAS TX 75201
ISSUED DATE:
8/28/2008
APPLIED DATE:
8/19/2008
EXPIRED DATE:
7/13/2011
SITE APN:
D301373
STATUS:
COMPLETED
APPLICANT:
SOTHERBY HOMES
2400 DALLAS PARKWAY #580
PLANO TX 75093
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
374840.64
FEE SUMMARY
INSPECTION SUMMARY
WATER IMPACT FEE$370.00
SEWER IMPACT FEE$499.00
CO/BUILDING FINAL 03/24/2011$30.00
CO/BUILDING FINAL 03/25/2011$30.00
WATER METER DEPOSIT$75.00
1 INCH METER$290.00
ELECTRICAL ROUGH IN 06/23/2010$30.00
GAS RELEASE 01/11/2011 JBS$30.00
GAS RELEASE 01/12/2011 JBS$30.00
PLUMBING FINAL 02/15/2011 JBS$30.00
PLUMBING FINAL 02/28/2011 JBS$30.00
RESIDENTIAL ELECTRIC FEE$181.20
MISCELLANOUS MECHANICAL FEES$175.50
MISCELLANEOUS PLUMBING FEES$312.00
BUILDING PERMIT FEE$2,368.75
FENCE FEE$20.00
UTILITY / ROW 02/15/2011 KB$30.00
COPIES - 11X17 (15 PAGES)$7.50
PLAN REVIEW FEE$50.00
2NDS/FRAMING 07/01/2010 REED$30.00
INSULATION 08/18/2010 REED$30.00
INSULATION 08/23/2010 REED$30.00
ELECTRICAL FINAL 11/29/2010 R$30.00
GAS RELEASE 12/28/2010 TRC$30.00
Total Fees:$4,738.95
______  METER PAYMENT
______  T-POLE
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  SLAB
______  CAMERA
______  T-POLE
______  PLUMBTOPOUT AND MECHRGH
______  ELECTRICAL ROUGH IN
______  ELECTRICAL ROUGH IN
______  ELECTRICAL ROUGH IN
______  T-POLE
______  2NDS/FRAMING
______  ELECTRICAL ROUGH IN
______  T-POLE
______  2NDS/FRAMING
______  2NDS/FRAMING
______  BRICK
______  INSULATION
______  INSULATION
______  INSULATION
______  DRY WALL
______  DRY WALL
______  DRY WALL
______  DRY WALL
______  DRY WALL
______  FLATWORK
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  GAS RELEASE
______  GAS RELEASE
______  GAS RELEASE
______  GAS RELEASE
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  UTILITY / ROW
______  PLUMBING FINAL
______  UTILITY / ROW
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  PLUMBING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)