|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 7/25/2008
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B08-2621
|
JOB ADDRESS: 10965 YORKSHIRE LN FRISCO, TX 75034 |
DESC:
4981 AC, 5803 SF, SFR / 2 STORY |
|
OWNER:
NEWCASTLE HOMES
8333 DOUGLAS AVE, # 1500 DALLAS TX 75225
|
CONTRACTOR:
NEWCASTLE HOMES
8333 DOUGLAS AVE, # 1500 DALLAS TX 75225
|
ISSUED DATE: 8/27/2008
APPLIED DATE:7/17/2008
EXPIRED DATE:2/23/2009
SITE APN:D283470
STATUS:COMPLETED
|
|
APPLICANT:
NEWCASTLE HOMES
8333 DOUGLAS AVE, # 1500 DALLAS TX 75225
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 371632.41
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CONVENIENCE FEE | $3.60 |
CONVENIENCE FEE | $2.70 |
2NDS/FRAMING 11/7/2008 CSW | $30.00 |
CO/BUILDING FINAL 2/17/2009 | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
ELECTRICAL ROUG 10/31/2008 | $30.00 |
PLUMBING TOP OU 10/27/2008 | $30.00 |
PLUMBING FINAL 2/11/2009 | $30.00 |
PLUMBING TOP OU 10/29/2008 | $30.00 |
GAS RELEASE 1/14/2009 | $30.00 |
RESIDENTIAL ELECTRIC FEE | $174.09 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
MISCELLANEOUS PLUMBING FEES | $281.00 |
BUILDING PERMIT FEE | $2,353.75 |
FENCE FEE | $20.00 |
Total Fees: | $3,546.14 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ SLAB |
______ CAMERA |
______ LATH |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ ELECTRICAL ROUGH IN |
______ PLUMBING TOP OUT |
______ ELECTRICAL ROUGH IN |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ FLATWORK |
______ GAS RELEASE |
______ GAS RELEASE |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|