|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 7/15/2008
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B08-2532
|
JOB ADDRESS: 5540 CAPE COD DR FRISCO, TX 75034 |
DESC:
6267 AC, 7521 SF, SFR / 2 STORY |
|
OWNER:
REDUS TX HOMES LLC
301 SOUTH COLLEGE CHARLOTTE NC 28288
|
CONTRACTOR:
DUNHILL HOMES
2100 MCKINNEY AVE DALLAS TX 75201
|
ISSUED DATE: 7/21/2008
APPLIED DATE:7/9/2008
EXPIRED DATE:11/6/2010
SITE APN:D301383
STATUS:COMPLETED
|
|
APPLICANT:
SOTHERBY HOMES
2400 DALLAS PARKWAY #580 PLANO TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 467580.87
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SET 1 PD METER 7/22/2008 BS | $30.00 |
ELECTRICAL ROUGH IN 06/28/2010 | $30.00 |
SLAB 8/25/2008 CSW | $30.00 |
CO 03/03/2011 CW | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
ELECTRICAL ROUGH IN 06/23/2010 | $30.00 |
2NDS/FRAMING 07/07/2010 GDS | $30.00 |
PLUMBING ROUGH- 8/7/2008 | $30.00 |
PLUMBING ROUGH- 8/8/2008 | $30.00 |
GAS RELEASE 01/11/2011 JBS | $30.00 |
PLUMBING FINAL 03/18/2011 JBS | $30.00 |
ELECTRICAL FINAL 11/23/2010 J | $30.00 |
ELECTRICAL FINAL 12/15/2010 J | $30.00 |
RESIDENTIAL ELECTRIC FEE | $188.01 |
MISCELLANOUS MECHANICAL FEES | $175.50 |
MISCELLANEOUS PLUMBING FEES | $316.00 |
BUILDING PERMIT FEE | $2,833.75 |
FENCE FEE | $20.00 |
COPIES - 11X17 (18 PAGES) | $9.00 |
PLAN REVIEW FEE | $50.00 |
WATER IMPACT FEE | $370.00 |
SEWER IMPACT FEE | $499.00 |
2NDS/FRAMING 07/20/2010 REED | $30.00 |
INSULATION 08/12/2010 REED | $30.00 |
ELECTRICAL FINAL 11/29/2010 R | $30.00 |
PLUMBING TOP OU 10/6/2008 | $30.00 |
T-HEAT 11/19/2010 TRC | $30.00 |
GAS RELEASE 12/28/2010 TRC | $30.00 |
Total Fees: | $5,366.26 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ FLATWORK |
______ SLAB |
______ SLAB |
______ CAMERA |
______ PLUMBING TOP OUT |
______ T-POLE |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL ROUGH IN |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ T-HEAT |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ CAMERA |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ CO/BUILDING FINAL |
______ PLUMBING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|