APPROVED DATE: 7/15/2008
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B08-2518
|
JOB ADDRESS: 13970 HOT SPRINGS LN FRISCO, TX |
DESC:
2583 AC, 3131 SF, SFR / 2 STORY |
|
OWNER:
DR HORTON
1901 ASCENSION BLVD.,#100 ARLINGTON TX 76006
|
CONTRACTOR:
DR HORTON
1901 ASCENSION BLVD.,#100 ARLINGTON TX 76006
|
ISSUED DATE: 7/22/2008
APPLIED DATE:7/8/2008
EXPIRED DATE:1/18/2009
SITE APN:C2613729
STATUS:COMPLETED
|
|
APPLICANT:
DR HORTON
1901 ASCENSION BLVD.,#100 ARLINGTON TX 76006
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 192717.63
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SET 1 PD METER 7/23/2008 BS | $30.00 |
SET 1 PD METER 8/1/2008 BS | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
THOROUGHFARE IMPACT FEE | $1,975.00 |
WATER IMPACT FEE | $388.00 |
SEWER IMPACT FEE | $523.00 |
PLUMBING TOP OU 9/11/2008 | $30.00 |
BUILDING PERMIT FEE | $1,458.75 |
RESIDENTIAL ELECTRIC FEE | $93.93 |
MISCELLANOUS MECHANICAL FEES | $129.50 |
MISCELLANEOUS PLUMBING FEES | $216.00 |
FENCE FEE | $20.00 |
Total Fees: | $5,259.18 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ FLATWORK |
______ SLAB |
______ CAMERA |
______ ELECTRICAL FINAL |
______ PLUMBING TOP OUT |
______ ELECTRICAL ROUGH IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|