|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 7/10/2008
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B08-2491
|
JOB ADDRESS: 3014 CLEARFORK TRL FRISCO, TX 75034 |
DESC:
4036 AC, 4984 SF, SFR / 2 STORY |
|
OWNER:
BOK FINANCIAL SERVICES
6242 EAST 41ST, 3RD FLOOR TULSA OK 74135
|
CONTRACTOR:
SIGNATURE CONSTRUCTION
1321 BURNETT DR LANTANA TX 76226
|
ISSUED DATE: 7/17/2008
APPLIED DATE:7/7/2008
EXPIRED DATE:6/29/2010
SITE APN:D297757
STATUS:COMPLETED
|
|
APPLICANT:
SOTHERBY HOMES
2400 DALLAS PARKWAY #580 PLANO TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 301125.96
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CREDIT CARD FEE | $1.50 |
CREDIT CARD FEE | $1.50 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
CREDIT CARD FEE | $0.90 |
UTILITY / ROW 3/8/2010 12:00:0 | $30.00 |
PLAN REVIEW FEE | $50.00 |
PLAN REVIEW FEE | $50.00 |
SLAB 8/1/2008 | $30.00 |
2NDS/FRAMING 9/15/2008 | $30.00 |
FLATWORK 10/23/2008 | $30.00 |
PLUMBING TOP OU 9/3/2008 | $30.00 |
RESIDENTIAL ELECTRIC FEE | $152.64 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
MISCELLANEOUS PLUMBING FEES | $253.00 |
BUILDING PERMIT FEE | $2,003.75 |
FENCE FEE | $20.00 |
SLAB 8/4/2008 WKT | $30.00 |
Total Fees: | $3,214.29 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ T-POLE |
______ SLAB |
______ SLAB |
______ SLAB |
______ SLAB |
______ CAMERA |
______ PLUMBING TOP OUT |
______ ELECTRICAL ROUGH IN |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|