|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 6/30/2008
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B08-2298
|
JOB ADDRESS: 11141 CLASSIC LN FRISCO, TX 75034 |
DESC:
4429 AC, 5106 SF, SFR / 2 STORY |
|
OWNER:
BOK FINANCIAL SERVICES
6242 EAST 41ST, 3RD FLOOR FRISCO TX 74135
|
CONTRACTOR:
SIGNATURE CONSTRUCTION
1321 BURNETT DR LANTANA TX 76226
|
ISSUED DATE: 7/15/2008
APPLIED DATE:6/25/2008
EXPIRED DATE:4/1/2010
SITE APN:D288657
STATUS:COMPLETED
|
|
APPLICANT:
SOTHERBY HOMES
2400 DALLAS PARKWAY #580 PLANO TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 330447.69
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CREDIT CARD FEE | $1.50 |
CREDIT CARD FEE | $1.50 |
SET 1 PD METER 7/16/2008 BS | $30.00 |
2NDS/FRAMING 10/20/2008 CSW | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
CREDIT CARD FEE | $3.60 |
CREDIT CARD FEE | $0.90 |
PLUMBING ROUGH- 9/2/2008 | $30.00 |
GAS RELEASE 4/26/2010 12:00:00 | $30.00 |
PLUMBING FINAL 4/26/2010 12:00 | $30.00 |
PLUMBING FINAL 4/27/2010 12:00 | $30.00 |
PLUMBING FINAL 4/28/2010 12:00 | $30.00 |
RESIDENTIAL ELECTRIC FEE | $153.18 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
MISCELLANEOUS PLUMBING FEES | $253.00 |
BUILDING PERMIT FEE | $2,148.75 |
FENCE FEE | $20.00 |
ELECTRICAL FINAL 5/4/2010 12:0 | $30.00 |
PLAN REVIEW FEE | $50.00 |
PLAN REVIEW FEE | $50.00 |
Total Fees: | $3,423.43 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ PLUMBING TOP OUT |
______ ELECTRICAL ROUGH IN |
______ LATH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK |
______ FLATWORK |
______ FLATWORK |
______ GAS RELEASE |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|