APPROVED DATE: 6/13/2008 PERMIT SUB-TYPE: CNEW PERMIT NO: B08-1813
JOB ADDRESS:
7525 GAYLORD PKWY
FRISCO, TX 75034
DESC:   330000 SQ FT, CNEW / FRISCO STAR CENTER PARKING GARAGE
OWNER:
CITY OF FRISCO

FRISCO TX 75034-3253

CONTRACTOR:
BALFOUR BEATTY CONST (DALLAS)
3100 MCKINNON AVE
DALLAS TX 75201
ISSUED DATE:
6/16/2008
APPLIED DATE:
5/23/2008
EXPIRED DATE:
12/13/2008
SITE APN:
C2707419
STATUS:
COMPLETED
APPLICANT:
BALFOUR BEATTY CONST (DALLAS)
3100 MCKINNON AVE
DALLAS TX 75201
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
10000000
FEE SUMMARY
INSPECTION SUMMARY
______  ELECTRICAL
______  FOOTINGS
______  PIER
______  PLUMBING ROUGH-IN
______  PIER
______  COMM SLAB
______  PLUMBING ROUGH-IN
______  COMM SLAB
______  COMM SLAB
______  COMM SLAB
______  COMM SLAB
______  COMM SLAB
______  COMM SLAB
______  ELECTRICAL
______  COMM SLAB
______  COMM SLAB
______  COMM SLAB
______  ELECTRICAL ROUGH IN
______  PAVING
______  ELECTRICAL ROUGH IN
______  ELECTRICAL ROUGH IN
______  COMM SLAB
______  COMM SLAB
______  COMM SLAB
______  PAVING
______  COMM SLAB
______  ELECTRICAL
______  COMM SLAB
______  ELECTRICAL ROUGH IN
______  PAVING
______  PAVING
______  ELECTRICAL ROUGH IN
______  COMM SLAB
______  ELECTRICAL ROUGH IN
______  COMM SLAB
______  COMM SLAB
______  PAVING
______  COMM SLAB
______  PAVING
______  COMM SLAB
______  ELECTRICAL ROUGH IN
______  PAVING
______  ELECTRICAL ROUGH IN
______  ELECTRICAL ROUGH IN
______  COMM SLAB
______  ELECTRICAL ROUGH IN
______  PAVING
______  ELECTRICAL ROUGH IN
______  PAVING
______  ELECTRICAL ROUGH IN
______  COMM SLAB
______  COMM SLAB
______  COMM SLAB
______  COMM SLAB
______  ELECTRICAL ROUGH IN
______  ELECTRICAL ROUGH IN
______  SLAB
______  PAVING
______  ELECTRICAL ROUGH IN
______  PAVING
______  ELECTRICAL RELEASE
______  COMM SLAB
______  COMM PLUMB TOP OUT
______  COMM PLUMB TOP OUT
______  COMM PLUMB TOP OUT
______  COMM PLUMB TOP OUT
______  PAVING
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  ELECTRICAL FINAL
______  FIRE FINAL
______  FIRE FINAL
______  FIRE FINAL
______  COMM CO
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)