APPROVED DATE: 6/13/2008
|
PERMIT SUB-TYPE: CALT
|
PERMIT NO: B08-1810
|
JOB ADDRESS: 2601 AVENUE OF THE STARS FRISCO, TX 75034 |
DESC:
154000 SQ FT, CALT / FRISCO STAR CENTER /Revision 10/9/09 |
|
OWNER:
SSR Collin Land, LP
1000 Ballpark Way, Ste 400 Arlington TX 76011
|
CONTRACTOR:
BALFOUR BEATTY CONST (DALLAS)
3100 MCKINNON AVE DALLAS TX 75201
|
ISSUED DATE: 6/16/2008
APPLIED DATE:5/23/2008
EXPIRED DATE:12/22/2009
SITE APN:C2544568
STATUS:COMPLETED
|
|
APPLICANT:
BALFOUR BEATTY CONST (DALLAS)
3100 MCKINNON AVE DALLAS TX 75201
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 20000000
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
WATER METER DEPOSIT | $75.00 |
6 INCH COMP METER | $3,700.00 |
Total Fees: | $4,140.00 |
|
|
| ______ GAS PRESSURE |
______ METER PAYMENT |
______ 6 PD METER |
______ PLUMBING ROUGH-IN |
______ FOOTINGS |
______ FOOTINGS |
______ FOOTINGS |
______ FOOTINGS |
______ PIER |
______ COMM SLAB |
______ COMM SLAB |
______ COMM SLAB |
______ COMM SLAB |
______ COMM FRAME |
______ COMM SLAB |
______ ELECTRICAL |
______ PLUMBING ROUGH-IN |
______ COMM SLAB |
______ PLUMBING ROUGH-IN |
______ COMM FRAME |
______ COMM FRAME |
______ ELECTRICAL ROUGH IN |
______ COMM FRAME |
______ COMM SLAB |
______ COMM FRAME |
______ PLUMBING ROUGH-IN |
______ COMM SLAB |
______ MECHANICAL |
______ COMM PLUMB TOP OUT |
______ ELEC WALL |
______ COMM SLAB |
______ COMMDRYWALL |
______ PLUMBING ROUGH-IN |
______ PRECON CONF |
______ COMM FRAME |
______ MECHANICAL |
______ MECHANICAL |
______ COMM FRAME |
______ VENT HOOD |
______ COMM PLUMB TOP OUT |
______ COMM FRAME |
______ CEILING |
______ MECHANICAL |
______ ELECTRICAL ROUGH IN |
______ COMM FRAME |
______ COMM PLUMB TOP OUT |
______ COMM PLUMB TOP OUT |
______ PLUMBING ROUGH-IN |
______ GAS PRESSURE |
______ PLUMBING ROUGH-IN |
______ COMM FRAME |
______ PAVING |
______ PAVING |
______ VENT HOOD |
______ COMM PLUMB TOP OUT |
______ COMM PLUMB TOP OUT |
______ MECHANICAL |
______ ELECTRICAL RELEASE |
______ COMM FRAME |
______ COMM FRAME |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL ROUGH IN |
______ MECHANICAL |
______ ELECTRICAL ROUGH IN |
______ CEILING |
______ BRICK |
______ COMM PLUMB TOP OUT |
______ MECHANICAL |
______ PLUMBING ROUGH-IN |
______ CEILING |
______ COMM FRAME |
______ CEILING |
______ ELECTRICAL ROUGH IN |
______ PLUMBING ROUGH-IN |
______ ELECTRICAL ROUGH IN |
______ COMM PLUMB TOP OUT |
______ CEILING |
______ COMM FRAME |
______ INSULATION |
______ MECHANICAL |
______ INSULATION |
______ ELECTRICAL ROUGH IN |
______ INSULATION |
______ INSULATION |
______ COMM FRAME |
______ MECHANICAL |
______ DRY WALL |
______ MECHANICAL |
______ MECHANICAL |
______ METER PAYMENT |
______ ELECTRICAL |
______ MISC FINAL |
______ SET 1 PD METER |
______ MECHANICAL |
______ CEILING |
______ MISC FINAL |
______ CEILING |
______ MECHANICAL FINAL |
______ MECHANICAL |
______ MECHANICAL |
______ ELECTRICAL FINAL |
______ MECHANICAL FINAL |
______ CEILING |
______ FIRE FINAL |
______ FIRE FINAL |
______ COMM PLUMB FINAL |
______ COURTESY HEALTH INSP |
______ FIRE FINAL |
______ FIRE FINAL |
______ HEALTH FINAL |
______ MISCCO |
______ ELECTRICAL FINAL |
______ COMM CO |
______ HEALTH FINAL |
______ FOLLOW-UP |
______ ELECTRICAL FINAL |
______ COMM CO |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|