|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 3/12/2008
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B08-0481
|
JOB ADDRESS: 13450 MORLEY DR FRISCO, TX 75035 |
DESC:
3784 AC, 4614 SQ FT, SFR / 2 STORY |
|
OWNER:
DREES CUSTOM HOMES X-12/07
6051 STATE HIGHWAY #200 IRVING TX 75038
|
CONTRACTOR:
DREES CUSTOM HOMES X-12/07
6051 STATE HIGHWAY #200 IRVING TX 75038
|
ISSUED DATE: 3/28/2008
APPLIED DATE:3/5/2008
EXPIRED DATE:9/24/2008
SITE APN:C2591461
STATUS:COMPLETED
|
|
APPLICANT:
DREES CUSTOM HOMES X-12/07
6051 STATE HIGHWAY #200 IRVING TX 75038
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 282324.24
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMBING FINAL 8/19/2008 | $30.00 |
CONVENIENCE FEE | $0.90 |
CONVENIENCE FEE | $0.90 |
CONVENIENCE FEE | $1.80 |
CONVENIENCE FEE | $1.80 |
RESIDENTIAL ELECTRIC FEE | $138.42 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
MISCELLANEOUS PLUMBING FEES | $239.00 |
BUILDING PERMIT FEE | $1,908.75 |
FENCE FEE | $20.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
2NDS/FRAMING 6/13/2008 | $30.00 |
BRICK/WALL TIES 6/30/2008 | $30.00 |
DRY WALL 7/3/2008 | $30.00 |
ELECTRICAL FINAL 8/8/2008 RE | $30.00 |
PLUMBING TOP OUT 6/9/2008 TR | $30.00 |
Total Fees: | $2,992.57 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ DRY WALL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|