BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 2/7/2008
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B08-0106
|
JOB ADDRESS: 15157 BULL RUN DR FRISCO, TX 75035 |
DESC:
3697 AC, 4398 SF, SFR / 2 STORY |
|
OWNER:
GRAND HOMES
8350 N CENTRAL EXPRSWY, SUITE DALLAS TX 75206
|
CONTRACTOR:
GRAND HOMES
8350 N CENTRAL EXPRSWY, SUITE DALLAS TX 75206
|
ISSUED DATE: 2/12/2008
APPLIED DATE:1/23/2008
EXPIRED DATE:8/10/2008
SITE APN:C2543147
STATUS:COMPLETED
|
|
APPLICANT:
GRAND HOMES
8350 N CENTRAL EXPRSWY, SUITE DALLAS TX 75206
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 275833.17
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
REPLACEMENT CARD FEE | $10.00 |
CONVENIENCE FEE | $3.60 |
CONVENIENCE FEE | $1.80 |
CONVENIENCE FEE | $0.90 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
PLUMBING TOP OU 4/21/2008 | $30.00 |
BRICK/WALL TIES 5/1/2008 | $30.00 |
2NDS/FRAMING 5/8/2008 | $30.00 |
2NDS/FRAMING 4/28/2008 REED | $30.00 |
CO/BUILDING FINAL 8/6/2008 R | $30.00 |
UTILITY / ROW 7/16/2008 SAG | $30.00 |
PLUMBING FINAL 7/9/2008 | $30.00 |
RESIDENTIAL ELECTRIC FEE | $131.94 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
MISCELLANEOUS PLUMBING FEES | $253.00 |
BUILDING PERMIT FEE | $1,873.75 |
FENCE FEE | $20.00 |
Total Fees: | $3,005.99 |
|
|
| ______ PLUMBING ROUGH-IN |
______ T-POLE |
______ SLAB |
______ METER PAYMENT |
______ CAMERA |
______ SET 1 PD METER |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|