Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 11/20/2007 PERMIT SUB-TYPE: SNEW PERMIT NO: B07-2892
JOB ADDRESS:
15127 SALANO CREEK DR
FRISCO, TX 75035
DESC:   3132 AC, 3602 SF, SFR / 2 STORY
OWNER:
GRAND HOMES
8350 N CENTRAL EXPRSWY, SUITE
DALLAS TX 75206

CONTRACTOR:
GRAND HOMES
8350 N CENTRAL EXPRSWY, SUITE
DALLAS TX 75206
ISSUED DATE:
12/3/2007
APPLIED DATE:
11/12/2007
EXPIRED DATE:
5/31/2008
SITE APN:
C2543353
STATUS:
COMPLETED
APPLICANT:
GRAND HOMES
8350 N CENTRAL EXPRSWY, SUITE
DALLAS TX 75206
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
233678.52
FEE SUMMARY
INSPECTION SUMMARY
T-POLE 12/7/2007 CSW$30.00
WATER METER DEPOSIT$75.00
1 INCH METER$290.00
PLUMBING FINAL 4/21/2008$30.00
WATER USAGE ON NON FUNCTIONAL$500.00
PLUMBING TOP OU 1/18/2008$30.00
PLUMBING TOP OU 1/30/2008$30.00
FENCE FEE$20.00
BUILDING PERMIT FEE$1,663.75
MISCELLANEOUS PLUMBING FEES$209.00
MISCELLANOUS MECHANICAL FEES$123.00
RESIDENTIAL ELECTRIC FEE$108.06
ELECTRICAL FINA 4/8/2008$30.00
2NDS/FRAMING 2/29/2008$30.00
CONVENIENCE FEE$0.90
Total Fees:$3,169.71
______  METER PAYMENT
______  SET 1 PD METER
______  T-POLE
______  PLUMBING ROUGH-IN
______  SLAB
______  CAMERA
______  T-POLE
______  SLAB
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  DRY WALL
______  BRICK/WALL TIES
______  FLATWORK
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  WATER REGISTER
______  PLUMBING FINAL
______  UTILITY / ROW
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)