Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 11/30/2007 PERMIT SUB-TYPE: CNEW PERMIT NO: B07-2797
JOB ADDRESS:
4300 LEGACY DR
FRISCO, TX 75034
DESC:   6000 SQ FT, CNEW / SHELL
OWNER:
JGROSS BD LLC
5005 RIVERWAY DR STE 460
HOUSTON TX 77056

CONTRACTOR:
DH CONSTRUCTION-exp reg
P.O. BOX 182033
ARLINGTON TX 76096
ISSUED DATE:
2/5/2008
APPLIED DATE:
11/5/2007
EXPIRED DATE:
3/3/2010
SITE APN:
C2122595
STATUS:
COMPLETED
APPLICANT:
Fitzgerald & Associates
3900 N Santa Fe Avenue
Oklahoma City OK 73118
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
500000
FEE SUMMARY
INSPECTION SUMMARY
WATER METER DEPOSIT$75.00
1.5 INCH PD METER$400.00
MISCELLANOUS MECHANICAL FEES$82.70
MISCELLANEOUS PLUMBING FEES$97.00
COMMERCIAL ELECTRIC FEE$303.00
COMMERCIAL BUILDING PERMIT FEE$1,796.25
THOROUGHFARE IMPACT FEE$33,010.00
WATER IMPACT FEE$14,333.00
SEWER IMPACT FEE$7,767.00
PLAN REVIEW FEE$100.00
FIRE DEPT INSPECTION FEES$50.00
Total Fees:$58,013.95
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  WATER
______  PIER
______  COMM SLAB
______  PAVING
______  PAVING
______  ELECTRICAL
______  RETAINING WALL
______  PAVING
______  COMMDRYWALL
______  FLATWORK
______  FLATWORK
______  FLATWORK
______  ELECTRICAL ROUGH IN
______  LATH
______  LATH
______  COMM PLUMB TOP OUT
______  METER PAYMENT
______  SET 1 1/2 PD METER
______  GAS PRESSURE
______  ELECTRICAL RELEASE
______  ELECTRICAL RELEASE
______  PLUMBING ROUGH-IN
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  FIRE FINAL
______  FIRE FINAL
______  MECHANICAL FINAL
______  BUILDING FINAL
______  PLUMBING FINAL
______  BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)