Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 8/30/2007 PERMIT SUB-TYPE: SNEW PERMIT NO: B07-2253
JOB ADDRESS:
12951 SEWANEE DR
FRISCO, TX 75035
DESC:   3400 AC, 4045 SF, SFR / 2 STORY
OWNER:
CHOICE HOMES
PO BOX 1048
ARLINGTON TX 76004

CONTRACTOR:
CHOICE HOMES
PO BOX 1048
ARLINGTON TX 76004
ISSUED DATE:
9/6/2007
APPLIED DATE:
8/27/2007
EXPIRED DATE:
3/4/2008
SITE APN:
C2587361
STATUS:
COMPLETED
APPLICANT:
CHOICE HOMES
PO BOX 1048
ARLINGTON TX 76004
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
253674
FEE SUMMARY
INSPECTION SUMMARY
PLUMBING TOP OU 10/23/2007$30.00
PLUMBING ROUGH- 9/19/2007$30.00
PLUMBING ROUGH- 9/18/2007$30.00
SLAB 9/25/2007 TLB$30.00
WATER REGISTER PROBLEM$190.00
UTILITY / ROW 1/9/2008 KB$35.00
FENCE FEE$20.00
BUILDING PERMIT FEE$1,763.75
MISCELLANEOUS PLUMBING FEES$239.00
MISCELLANOUS MECHANICAL FEES$129.50
RESIDENTIAL ELECTRIC FEE$121.35
1 INCH METER$290.00
WATER METER DEPOSIT$75.00
CONVENIENCE FEE$6.75
Total Fees:$2,990.35
______  METER PAYMENT
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  T-POLE
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  SLAB
______  FLATWORK
______  SLAB
______  CAMERA
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  2NDS/FRAMING
______  INSULATION
______  DRY WALL
______  BRICK/WALL TIES
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  ELECTRICAL FINAL
______  UTILITY / ROW
______  UTILITY / ROW
______  WATER REGISTER
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)