|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 8/10/2007
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B07-1816
|
JOB ADDRESS: 2356 HAGUE DR FRISCO, TX 75034 |
DESC:
5798 AC, 6577 SF, SFR / 2 STORY |
|
OWNER:
JASON H. SANDELL
21 STONEBRIAR WAY Frisco Tx 75034
|
CONTRACTOR:
JASON H. SANDELL
21 STONEBRIAR WAY Frisco Tx 75034
|
ISSUED DATE: 8/13/2007
APPLIED DATE:7/6/2007
EXPIRED DATE:7/29/2008
SITE APN:D272499
STATUS:COMPLETED
|
|
APPLICANT:
JASON H. SANDELL
21 STONEBRIAR WAY Frisco Tx 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 432588.78
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CREDIT CARD FEE | $98.89 |
CREDIT CARD FEE | $4.00 |
CONVENIENCE FEE | $5.40 |
CONVENIENCE FEE | $3.60 |
CONVENIENCE FEE | $3.60 |
CONVENIENCE FEE | $1.80 |
CO/BUILDING FINAL 8/27/2008 | $30.00 |
FLATWORK 11/1/2007 CW | $30.00 |
FLATWORK 11/2/2007 CW | $30.00 |
ELECTRICAL FINA 6/9/2008 | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
T-POLE 8/17/2007 | $30.00 |
T-POLE 8/17/2007 REED | $30.00 |
CO/BUILDING FINAL 8/7/2008 R | $30.00 |
PLUMBING FINAL 6/9/2008 | $30.00 |
PLUMBING FINAL 6/16/2008 | $30.00 |
PLUMBING FINAL 6/17/2008 | $30.00 |
PLUMBING TOP OUT 12/27/2007 | $30.00 |
RESIDENTIAL ELECTRIC FEE | $173.94 |
MISCELLANOUS MECHANICAL FEES | $142.50 |
MISCELLANEOUS PLUMBING FEES | $251.00 |
PLAN REVIEW FEE | $50.00 |
BUILDING PERMIT FEE | $2,658.75 |
FENCE FEE | $20.00 |
2NDS/FRAMING 12/31/2007 WKT | $30.00 |
2NDS/FRAMING 1/9/2008 WKT | $30.00 |
BRICK/WALL TIES 1/14/2008 WK | $30.00 |
BRICK/WALL TIES 1/18/2008 WK | $30.00 |
INSULATION 1/25/2008 WKT | $30.00 |
BRICK/WALL TIES 1/25/2008 WK | $30.00 |
DRY WALL 2/4/2008 WKT | $30.00 |
PLAN REVIEW FEE | $50.00 |
RESIDENTIAL ELECTRIC FEE | $23.37 |
Total Fees: | $4,391.85 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ SLAB |
______ T-POLE |
______ CAMERA |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ BRICK/WALL TIES |
______ BRICK/WALL TIES |
______ INSULATION |
______ BRICK/WALL TIES |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ DRY WALL |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|