|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 7/3/2007
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B07-1710
|
JOB ADDRESS: 13858 SALMON DR FRISCO, TX |
DESC:
2402 AC, 2960 SF, SFR / 1 STORY |
|
OWNER:
DR HORTON
1901 ASCENSION BLVD.,#100 ARLINGTON TX 76006
|
CONTRACTOR:
DR HORTON
1901 ASCENSION BLVD.,#100 ARLINGTON TX 76006
|
ISSUED DATE: 8/29/2007
APPLIED DATE:6/28/2007
EXPIRED DATE:2/25/2008
SITE APN:C2613760
STATUS:COMPLETED
|
|
APPLICANT:
DR HORTON
1901 ASCENSION BLVD.,#100 ARLINGTON TX 76006
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 179213.22
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
LAWNSPRINKLERSYSTEM | $35.00 |
CAMERA 9/10/2007 CB | $30.00 |
2NDS/FRAMING 10/11/2007 JBS | $30.00 |
2NDS/FRAMING 10/12/2007 JBS | $30.00 |
CO/BUILDING FINAL 12/7/2007 | $30.00 |
RESIDENTIAL ELECTRIC FEE | $88.80 |
MISCELLANOUS MECHANICAL FEES | $103.00 |
MISCELLANEOUS PLUMBING FEES | $209.00 |
BUILDING PERMIT FEE | $1,393.75 |
FENCE FEE | $20.00 |
THOROUGHFARE IMPACT FEE | $1,975.00 |
WATER IMPACT FEE | $388.00 |
SEWER IMPACT FEE | $523.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
PLUMBING TOP OU 9/28/2007 | $30.00 |
PLUMBING TOP OUT 10/2/2007 T | $30.00 |
Total Fees: | $5,280.55 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ SLAB |
______ CAMERA |
______ FLATWORK |
______ T-POLE |
______ CAMERA |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|