BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 7/25/2007
|
PERMIT SUB-TYPE: CNEW
|
PERMIT NO: B07-1550
|
JOB ADDRESS: 2875 MAIN ST FRISCO, TX |
DESC:
10,000 SQ FT, CNEW / TEEL VILLAGE PHASE III-BLDG A |
|
OWNER:
Hebron Heights, LP
800 FM Hwy 720 West, Suite 112 Little Elm TX 75068
|
CONTRACTOR:
HEBRON HEIGHTS LP
1837 FRANKFORD CARROLLTON TX 75007
|
ISSUED DATE: 8/28/2007
APPLIED DATE:6/11/2007
EXPIRED DATE:2/24/2008
SITE APN:R622900102002
STATUS:COMPLETED
|
|
APPLICANT:
ICS COMMERCIAL
3624 OAK LAWN, #325 DALLAS TX 75219
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 520000
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
WATER METER DEPOSIT | $75.00 |
2 INCH PD METER | $490.00 |
2 INCH TURB METER | $615.00 |
WATER METER DEPOSIT | $75.00 |
MISCELLANEOUS ELECTRICAL FEES | $315.00 |
MISCELLANOUS MECHANICAL FEES | $112.30 |
MISCELLANEOUS PLUMBING FEES | $173.00 |
COMMERCIAL BUILDING PERMIT FEE | $1,997.25 |
Total Fees: | $3,852.55 |
|
|
| ______ T-POLE |
______ ELECTRICAL |
______ MISC SLAB |
______ PAVING |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ METER PAYMENT |
______ METER PAYMENT |
______ SET 2 PD METER |
______ SET 2 TURB METER |
______ ELECTRICAL |
______ PIER |
______ MISCFRAME |
______ BRICK |
______ COMM PLUMB TOP OUT |
______ ELECTRICAL |
______ WATER |
______ PLUMBING FINAL |
______ ELECTRICAL RELEASE |
______ ELECTRICAL FINAL |
______ MECHANICAL FINAL |
______ INSULATION |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ COMM CO |
______ BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|