Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 6/12/2007 PERMIT SUB-TYPE: SNEW PERMIT NO: B07-1518
JOB ADDRESS:
7194 REFLECTION BAY DR
FRISCO, TX
DESC:   1755 AC, 2575 SF, SFR / 1 STORY
OWNER:
PULTE HOMES
1234 LAKESHORE DR, #750A
COPPELL TX 75019

CONTRACTOR:
PULTE HOMES
1234 LAKESHORE DR, #750A
COPPELL TX 75019
ISSUED DATE:
6/14/2007
APPLIED DATE:
6/7/2007
EXPIRED DATE:
12/11/2007
SITE APN:
D298308
STATUS:
COMPLETED
APPLICANT:
PULTE HOMES
1234 LAKESHORE DR, #750A
COPPELL TX 75019
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
130940.55
FEE SUMMARY
INSPECTION SUMMARY
LAWNSPRINKLERSYSTEM$35.00
WATER IMPACT FEE$388.00
SEWER IMPACT FEE$523.00
RESIDENTIAL ELECTRIC FEE$77.25
MISCELLANOUS MECHANICAL FEES$96.50
MISCELLANEOUS PLUMBING FEES$188.00
BUILDING PERMIT FEE$1,148.75
FENCE FEE$20.00
WATER METER DEPOSIT$75.00
1 INCH METER$290.00
2NDS/FRAMING 8/17/2007 WKT$30.00
INSULATION 8/23/2007 WKT$30.00
ELECTRICAL FINAL 9/25/2007 W$30.00
Total Fees:$2,931.50
______  METER PAYMENT
______  T-POLE
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  FLATWORK
______  SLAB
______  CAMERA
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  INSULATION
______  DRY WALL
______  BRICK/WALL TIES
______  BRICK/WALL TIES
______  PLUMBING FINAL
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  UTILITY / ROW
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)