|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 5/1/2007
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B07-1087
|
JOB ADDRESS: 11153 BERKELEY HALL LN FRISCO, TX 75034 |
DESC:
4036 AC, 4749 SF, SFR / 2 STORY |
|
OWNER:
SOTHERBY HOMES
2400 DALLAS PARKWAY #580 PLANO TX 75093
|
CONTRACTOR:
SOTHERBY HOMES
2400 DALLAS PARKWAY #580 PLANO TX 75093
|
ISSUED DATE: 5/9/2007
APPLIED DATE:4/26/2007
EXPIRED DATE:11/5/2007
SITE APN:D288597
STATUS:COMPLETED
|
|
APPLICANT:
SOTHERBY HOMES
2400 DALLAS PARKWAY #580 PLANO TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 301125.96
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
LAWNSPRINKLERSYSTEM | $35.00 |
SET 1 PD METER 5/15/2007 BS | $30.00 |
CREDIT CARD FEE | $0.90 |
CONVENIENCE FEE | $0.90 |
INSULATION 8/13/2007 CSW | $30.00 |
BRICK/WALL TIES 8/13/2007 CS | $30.00 |
ELECTRICAL FINAL 9/28/2007 C | $30.00 |
RESIDENTIAL ELECTRIC FEE | $142.47 |
MISCELLANOUS MECHANICAL FEES | $129.50 |
MISCELLANEOUS PLUMBING FEES | $253.00 |
BUILDING PERMIT FEE | $2,003.75 |
FENCE FEE | $20.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
FLATWORK 7/25/2007 REED | $30.00 |
PLUMBING ROUGH- 5/23/2007 | $30.00 |
PLUMBING TOP OU 7/3/2007 | $30.00 |
Total Fees: | $3,160.52 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ LATH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ INSULATION |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|