|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 4/16/2007
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B07-0897
|
JOB ADDRESS: 13791 HOT SPRINGS LN FRISCO, TX |
DESC:
3736 AC, 4492 SF, SFR / 2 STORY |
|
OWNER:
DR HORTON
1901 ASCENSION BLVD.,#100 ARLINGTON TX 76006
|
CONTRACTOR:
DR HORTON
1901 ASCENSION BLVD.,#100 ARLINGTON TX 76006
|
ISSUED DATE: 4/18/2007
APPLIED DATE:4/9/2007
EXPIRED DATE:10/15/2007
SITE APN:C2613740
STATUS:COMPLETED
|
|
APPLICANT:
DR HORTON
1901 ASCENSION BLVD.,#100 ARLINGTON TX 76006
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 278742.96
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SET 1 PD METER 4/19/2007 BS | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
PLUMBING FINAL 9/11/2007 | $30.00 |
T-POLE 4/19/2007 WKT | $30.00 |
SEWER IMPACT FEE | $523.00 |
WATER IMPACT FEE | $388.00 |
THOROUGHFARE IMPACT FEE | $1,975.00 |
FENCE FEE | $20.00 |
BUILDING PERMIT FEE | $1,888.75 |
MISCELLANEOUS PLUMBING FEES | $246.00 |
MISCELLANOUS MECHANICAL FEES | $129.50 |
RESIDENTIAL ELECTRIC FEE | $134.76 |
Total Fees: | $5,760.01 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ FLATWORK |
______ SLAB |
______ FLATWORK |
______ CAMERA |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|