|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 3/23/2007
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B07-0663
|
JOB ADDRESS: 4842 JADI LANE FRISCO, TX |
DESC:
3899 AC, 4753 SF, SFR / 2 STORY |
|
OWNER:
STANDARD PACIFIC HOMES X-9/200
6333 N. STATE HIGHWAY 161., ST IRVING TX 75038
|
CONTRACTOR:
STANDARD PACIFIC HOMES X-9/200
6333 N. STATE HIGHWAY 161., ST IRVING TX 75038
|
ISSUED DATE: 3/29/2007
APPLIED DATE:3/16/2007
EXPIRED DATE:9/25/2007
SITE APN:
STATUS:COMPLETED
|
|
APPLICANT:
STANDARD PACIFIC HOMES X-9/200
6333 N. STATE HIGHWAY 161., ST IRVING TX 75038
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 290904.39
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CAMERA 4/20/2007 CB | $30.00 |
LAWNSPRINKLERSYSTEM | $35.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
RESIDENTIAL ELECTRIC FEE | $142.59 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
MISCELLANEOUS PLUMBING FEES | $246.00 |
BUILDING PERMIT FEE | $1,948.75 |
FENCE FEE | $20.00 |
PLUMBING FINAL 8/6/2007 | $30.00 |
WATER IMPACT FEE | $388.00 |
SEWER IMPACT FEE | $523.00 |
ELECTRICAL FINAL 8/6/2007 RM | $30.00 |
Total Fees: | $3,894.34 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ CAMERA |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ DRY WALL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ MECHANICAL FINAL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ MECHANICAL FINAL |
______ MECHANICAL FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|