|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 1/5/2007
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B07-0027
|
JOB ADDRESS: 456 OAKLAND HILLS LN FRISCO, TX |
DESC:
1682 AC, 2430 SF, SFR / 1 STORY |
|
OWNER:
PULTE HOMES
1234 LAKESHORE DR, #750A COPPELL TX 75019
|
CONTRACTOR:
PULTE HOMES
1234 LAKESHORE DR, #750A COPPELL TX 75019
|
ISSUED DATE: 1/11/2007
APPLIED DATE:1/4/2007
EXPIRED DATE:7/10/2007
SITE APN:D298157
STATUS:COMPLETED
|
|
APPLICANT:
PULTE HOMES
1234 LAKESHORE DR, #750A COPPELL TX 75019
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 125494.02
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
LAWNSPRINKLERSYSTEM | $35.00 |
RESIDENTIAL ELECTRIC FEE | $2.19 |
MISCELLANOUS MECHANICAL FEES | $90.00 |
MISCELLANEOUS PLUMBING FEES | $181.00 |
BUILDING PERMIT FEE | $1,123.75 |
FENCE FEE | $20.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
PLUMBING TOP OU 4/12/2007 | $30.00 |
WATER IMPACT FEE | $388.00 |
SEWER IMPACT FEE | $523.00 |
INSULATION 4/19/2007 SWE | $30.00 |
DRY WALL 4/23/2007 SWE | $30.00 |
Total Fees: | $2,817.94 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ FLATWORK |
______ SLAB |
______ FLATWORK |
______ SLAB |
______ CAMERA |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ BRICK/WALL TIES |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|