Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 12/11/2006 PERMIT SUB-TYPE: SNEW PERMIT NO: B06-4477
JOB ADDRESS:
4910 MONTEREY DR
FRISCO, TX 75034
DESC:   7298 AC, 9479 SF, SFR / 2 STORY
OWNER:
BAKER QUALITY HOME X-07/07
5729 LEBANON RD STE 144-216
FRISCO TX 75034

CONTRACTOR:
BAKER QUALITY HOME X-07/07
5729 LEBANON RD STE 144-216
FRISCO TX 75034
ISSUED DATE:
12/18/2006
APPLIED DATE:
12/8/2006
EXPIRED DATE:
6/16/2007
SITE APN:
C2143003
STATUS:
COMPLETED
APPLICANT:
BAKER QUALITY HOME X-07/07
5729 LEBANON RD STE 144-216
FRISCO TX 75034
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
544503.78
FEE SUMMARY
INSPECTION SUMMARY
CREDIT CARD FEE$8.40
CO/BUILDING FINAL 2/19/2008$30.00
RESIDENTIAL ELECTRIC FEE$284.37
MISCELLANOUS MECHANICAL FEES$182.00
MISCELLANEOUS PLUMBING FEES$335.00
BUILDING PERMIT FEE$3,447.50
FENCE FEE$20.00
PLUMBING TOP OU 4/18/2007$30.00
PLUMBING FINAL 1/18/2008$30.00
PLUMBING FINAL 2/5/2008$30.00
UTILITY / ROW 1/18/2008 KB$30.00
DRY WALL 5/18/2007 POB$30.00
1 INCH METER$290.00
WATER METER DEPOSIT$75.00
WATER REGISTER PROBLEM$190.00
ELECTRICAL FINA 1/10/2008$30.00
SET 1 PD METER 12/19/2006 RG$30.00
2NDS/FRAMING 4/30/2007 WDP$30.00
Total Fees:$5,102.27
______  METER PAYMENT
______  T-POLE
______  SET 1 PD METER
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  SLAB
______  SLAB
______  CAMERA
______  BRICK/WALL TIES
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  DRY WALL
______  BRICK/WALL TIES
______  DRY WALL
______  BRICK/WALL TIES
______  2NDS/FRAMING
______  FLATWORK
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  WATER REGISTER
______  PLUMBING FINAL
______  UTILITY / ROW
______  UTILITY / ROW
______  PLUMBING FINAL
______  PLUMBING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)