BUILDING
Permit Payment Receipt
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
|
APPROVED DATE: 3/20/2007
|
PERMIT SUB-TYPE: SCHL
|
PERMIT NO: B06-4333
|
| JOB ADDRESS: 9889 WADE BLVD FRISCO, TX |
DESC:
138088 SQ FT, SCHL / FISD CAREER & TECHNOLOGY CENTER (CATE) |
|
OWNER:
Frisco Independent School Dist
6942 Maple Street Frisco Tx 75034
|
CONTRACTOR:
CADENCE MCSHANE CORP.
14860 Montfort Drive Dallas Tx 75248
|
|
ISSUED DATE: 4/5/2007
APPLIED DATE:11/21/2006
EXPIRED DATE:2/3/2018
SITE APN:
STATUS:COMPLETED
|
|
APPLICANT:
SHW GROUP
4000 McEWEN RD. N. Dallas TX 75244
| |
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 24000000
|
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
| CREDIT CARD FEE | $3.15 |
| SET 2 TURB METER 12/17/2007 | $30.00 |
| CREDIT CARD FEE | $4.05 |
| CREDIT CARD FEE | $2.10 |
| 1 1/2 INCH CURBSTOP REPAIR | $0.00 |
| COMMDRYWALL 1/29/2008 CW | $35.00 |
| T-POLE 6/14/2007 JB | $35.00 |
| BRICK/WALL TIES 10/31/2007 J | $35.00 |
| WATER METER DEPOSIT | $75.00 |
| WATER METER DEPOSIT | $75.00 |
| WATER METER DEPOSIT | $75.00 |
| 2 INCH TURB METER | $615.00 |
| 2 INCH TURB METER | $615.00 |
| 2 INCH TURB METER | $615.00 |
| WATER METER DEPOSIT | $75.00 |
| WATER METER DEPOSIT | $75.00 |
| WATER METER DEPOSIT | $75.00 |
| 4 INCH COMP METER | $2,400.00 |
| 4 INCH COMP METER | $2,400.00 |
| 2 INCH PD METER | $400.00 |
| 2 INCH PD METER | $90.00 |
| GAS AIR TEST 2/11/2008 | $35.00 |
| ROOF DRAINS 4/23/2008 | $35.00 |
| GREASE TRAP 11/28/2007 | $35.00 |
| DUCT ROUGH 6/3/2008 | $35.00 |
| MECHANICAL FINA 7/11/2008 | $35.00 |
| DUCT ROUGH 2/11/2008 TW | $35.00 |
| MISCELLANEOUS ELECTRICAL FEES | $6,038.52 |
| MISCELLANOUS MECHANICAL FEES | $3,357.20 |
| MISCELLANEOUS PLUMBING FEES | $2,552.00 |
| COMMERCIAL BUILDING PERMIT FEE | $46,837.14 |
| Total Fees: | $66,724.16 |
|
|
|
| | ______ T-POLE |
| ______ PIER |
| ______ FOOTINGS |
| ______ PIER |
| ______ ELECTRICAL ROUGH IN |
| ______ MISC |
| ______ ELECTRICAL ROUGH IN |
| ______ PIER |
| ______ T-POLE |
| ______ PIER |
| ______ PLUMBING ROUGH-IN |
| ______ PIER |
| ______ ELECTRICAL ROUGH IN |
| ______ PIER |
| ______ PLUMBING ROUGH-IN |
| ______ T-POLE |
| ______ PIER |
| ______ ELECTRICAL ROUGH IN |
| ______ PLUMBING ROUGH-IN |
| ______ ELECTRICAL ROUGH IN |
| ______ ELECTRICAL ROUGH IN |
| ______ PIER |
| ______ ELECTRICAL ROUGH IN |
| ______ PIER |
| ______ PIER |
| ______ PIER |
| ______ PIER |
| ______ ELECTRICAL |
| ______ PAVING |
| ______ PLUMBING ROUGH-IN |
| ______ PIER |
| ______ SLAB |
| ______ CAMERA |
| ______ CAMERA |
| ______ ROOF DRAINS |
| ______ SLAB |
| ______ SLAB |
| ______ PAVING |
| ______ PLUMBING ROUGH-IN |
| ______ CAMERA |
| ______ PAVING |
| ______ PIER |
| ______ ELECTRICAL ROUGH IN |
| ______ PLUMBING ROUGH-IN |
| ______ FIRELANE INSPECTION |
| ______ PLUMBING ROUGH-IN |
| ______ FIRELANE INSPECTION |
| ______ PAVING |
| ______ SLAB |
| ______ PLUMBING ROUGH-IN |
| ______ CAMERA |
| ______ FIRELANE INSPECTION |
| ______ PAVING |
| ______ PLUMBING ROUGH-IN |
| ______ PIER |
| ______ PIER |
| ______ PAVING |
| ______ PLUMBING ROUGH-IN |
| ______ PAVING |
| ______ PIER |
| ______ PAVING |
| ______ BRICK/WALL TIES |
| ______ SLAB |
| ______ BRICK/WALL TIES |
| ______ CAMERA |
| ______ CAMERA |
| ______ BRICK/WALL TIES |
| ______ BRICK/WALL TIES |
| ______ PAVING |
| ______ BRICK/WALL TIES |
| ______ PAVING |
| ______ BRICK/WALL TIES |
| ______ BRICK/WALL TIES |
| ______ PIER |
| ______ BRICK/WALL TIES |
| ______ PAVING |
| ______ SLAB |
| ______ BRICK/WALL TIES |
| ______ SLAB |
| ______ BRICK/WALL TIES |
| ______ CAMERA |
| ______ BRICK/WALL TIES |
| ______ BRICK/WALL TIES |
| ______ BRICK/WALL TIES |
| ______ BRICK/WALL TIES |
| ______ GREASE TRAP |
| ______ PIER |
| ______ BRICK/WALL TIES |
| ______ PIER |
| ______ BRICK/WALL TIES |
| ______ TILT WALL PANELS |
| ______ BRICK/WALL TIES |
| ______ BRICK/WALL TIES |
| ______ SLAB |
| ______ BRICK/WALL TIES |
| ______ CAMERA |
| ______ CAMERA |
| ______ CAMERA |
| ______ CAMERA |
| ______ CAMERA |
| ______ CAMERA |
| ______ CAMERA |
| ______ CAMERA |
| ______ CAMERA |
| ______ CAMERA |
| ______ CAMERA |
| ______ BRICK/WALL TIES |
| ______ BRICK/WALL TIES |
| ______ SLAB |
| ______ TILT WALL PANELS |
| ______ BRICK/WALL TIES |
| ______ BRICK/WALL TIES |
| ______ SLAB |
| ______ TILT WALL PANELS |
| ______ TILT WALL PANELS |
| ______ BRICK/WALL TIES |
| ______ CAMERA |
| ______ BRICK/WALL TIES |
| ______ PIER |
| ______ BRICK/WALL TIES |
| ______ BRICK/WALL TIES |
| ______ BRICK/WALL TIES |
| ______ BRICK/WALL TIES |
| ______ BRICK/WALL TIES |
| ______ BRICK/WALL TIES |
| ______ SLAB |
| ______ BRICK/WALL TIES |
| ______ CAMERA |
| ______ BRICK/WALL TIES |
| ______ BRICK/WALL TIES |
| ______ PIER |
| ______ BRICK/WALL TIES |
| ______ PIER |
| ______ BRICK/WALL TIES |
| ______ LATH |
| ______ BRICK/WALL TIES |
| ______ BRICK/WALL TIES |
| ______ BRICK/WALL TIES |
| ______ BRICK/WALL TIES |
| ______ LATH |
| ______ SLAB |
| ______ BRICK/WALL TIES |
| ______ BRICK/WALL TIES |
| ______ SLAB |
| ______ BRICK/WALL TIES |
| ______ CAMERA |
| ______ CAMERA |
| ______ BRICK/WALL TIES |
| ______ SLAB |
| ______ BRICK/WALL TIES |
| ______ BRICK/WALL TIES |
| ______ BRICK/WALL TIES |
| ______ BRICK/WALL TIES |
| ______ BRICK/WALL TIES |
| ______ BRICK/WALL TIES |
| ______ GREASE TRAP |
| ______ GREASE TRAP |
| ______ BRICK/WALL TIES |
| ______ GREASE TRAP |
| ______ BRICK/WALL TIES |
| ______ GREASE TRAP |
| ______ GREASE TRAP |
| ______ LATH |
| ______ ELEC WALL |
| ______ METER PAYMENT |
| ______ METER PAYMENT |
| ______ METER PAYMENT |
| ______ SET 2 TURB METER |
| ______ SET 2 TURB METER |
| ______ BRICK/WALL TIES |
| ______ COMM PLUMB TOP OUT |
| ______ PLUMBING ROUGH-IN |
| ______ ROOF DRAINS |
| ______ ROOF DRAINS |
| ______ ROOF DRAINS |
| ______ LATH |
| ______ COMM PLUMB TOP OUT |
| ______ ELEC WALL |
| ______ LATH |
| ______ MISCFRAME |
| ______ ROOF DRAINS |
| ______ ELEC WALL |
| ______ DUCT ROUGH |
| ______ MISCFRAME |
| ______ GAS PRESSURE |
| ______ MECHANICAL |
| ______ MECHANICAL |
| ______ MISCFRAME |
| ______ COMMDRYWALL |
| ______ INSULATION |
| ______ SET 2 TURB METER |
| ______ SET 2 TURB METER |
| ______ 4 PD METER |
| ______ 4 PD METER |
| ______ METER PAYMENT |
| ______ METER PAYMENT |
| ______ METER PAYMENT |
| ______ DRY WALL |
| ______ DRY WALL |
| ______ PAVING |
| ______ COMM PLUMB TOP OUT |
| ______ DUCT ROUGH |
| ______ DUCT ROUGH |
| ______ GAS AIR TEST |
| ______ PLUMBING ROUGH-IN |
| ______ COMM PLUMB TOP OUT |
| ______ DRY WALL |
| ______ PAVING |
| ______ DUCT ROUGH |
| ______ CEILING |
| ______ COMM FRAME |
| ______ COMM FRAME |
| ______ COMM PLUMB TOP OUT |
| ______ DUCT ROUGH |
| ______ ROOF DRAINS |
| ______ ELECTRICAL RELEASE |
| ______ DUCT ROUGH |
| ______ ELECTRICAL RELEASE |
| ______ COMM PLUMB TOP OUT |
| ______ GAS AIR TEST |
| ______ PLUMBING ROUGH-IN |
| ______ COMM PLUMB TOP OUT |
| ______ COMM PLUMB TOP OUT |
| ______ DRY WALL |
| ______ CEILING |
| ______ COMM PLUMB TOP OUT |
| ______ DRY WALL |
| ______ ELECTRICAL RELEASE |
| ______ COMM FRAME |
| ______ COMM PLUMB TOP OUT |
| ______ CEILING |
| ______ COMM PLUMB TOP OUT |
| ______ COMM PLUMB TOP OUT |
| ______ SET 2 PD METER |
| ______ ROOF DRAINS |
| ______ ELECTRICAL ROUGH IN |
| ______ ELEC WALL |
| ______ RETAINING WALL |
| ______ SIDEWALK |
| ______ ROOF DRAINS |
| ______ COMM PLUMB TOP OUT |
| ______ ROOF DRAINS |
| ______ ROOF DRAINS |
| ______ CEILING |
| ______ CEILING |
| ______ DUCT ROUGH |
| ______ VENT HOOD |
| ______ VENT HOOD |
| ______ CEILING |
| ______ CEILING |
| ______ CEILING |
| ______ DUCT ROUGH |
| ______ CEILING |
| ______ GAS RELEASE |
| ______ CEILING |
| ______ CEILING |
| ______ GAS RELEASE |
| ______ CEILING |
| ______ MECHANICAL ROUGH |
| ______ PLUMBING FINAL |
| ______ MECHANICAL FINAL |
| ______ ELECTRICAL FINAL |
| ______ MECHANICAL FINAL |
| ______ PLUMBING FINAL |
| ______ MECHANICAL FINAL |
| ______ ELECTRICAL FINAL |
| ______ ELECTRICAL FINAL |
| ______ MECHANICAL FINAL |
| ______ PLUMBING FINAL |
| ______ COURTESY HEALTH INSP |
| ______ PLUMBING FINAL |
| ______ COURTESY HEALTH INSP |
| ______ CEILING |
| ______ ELECTRICAL FINAL |
| ______ INSULATION |
| ______ MECHANICAL FINAL |
| ______ ELECTRICAL FINAL |
| ______ MECHANICAL FINAL |
| ______ HEALTH FINAL |
| ______ BUILDING FINAL |
| ______ COURTESY HEALTH INSP |
| ______ BUILDING FINAL |
| ______ SET 2 PD METER |
|
|
|
|