|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 11/16/2006
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B06-4231
|
JOB ADDRESS: 11099 THOMASVILLE LN FRISCO, TX 75034 |
DESC:
4398 AC, 5418 SF, SFR / 2 STORY |
|
OWNER:
NEWCASTLE HOMES
8333 DOUGLAS AVE, # 1500 DALLAS TX 75225
|
CONTRACTOR:
NEWCASTLE HOMES
8333 DOUGLAS AVE, # 1500 DALLAS TX 75225
|
ISSUED DATE: 11/29/2006
APPLIED DATE:11/13/2006
EXPIRED DATE:5/28/2007
SITE APN:D283434
STATUS:COMPLETED
|
|
APPLICANT:
NEWCASTLE HOMES
8333 DOUGLAS AVE, # 1500 DALLAS TX 75225
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 328134.78
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
LAWNSPRINKLERSYSTEM | $35.00 |
REPLACEMENT CARD FEE | $10.00 |
CO/BUILDING FINAL 9/6/2007 C | $30.00 |
CO/BUILDING FIN 8/31/2007 | $30.00 |
INSULATION 5/22/2007 JBS | $30.00 |
INSULATION 5/24/2007 JBS | $30.00 |
PLUMBING FINAL 8/6/2007 | $30.00 |
1 INCH METER | $290.00 |
WATER METER DEPOSIT | $65.00 |
WATER METER DEPOSIT | $10.00 |
WATER USAGE ON NON FUNCTIONAL | $500.00 |
PLUMBING TOP OU 5/2/2007 | $30.00 |
PLUMBING TOP OU 5/4/2007 | $30.00 |
PLUMBING TOP OU 5/9/2007 | $30.00 |
RESIDENTIAL ELECTRIC FEE | $162.54 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
MISCELLANEOUS PLUMBING FEES | $274.00 |
BUILDING PERMIT FEE | $2,138.75 |
FENCE FEE | $20.00 |
Total Fees: | $3,881.29 |
|
|
| ______ T-POLE |
______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ INSULATION |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ WATER REGISTER |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|