Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 12/5/2006 PERMIT SUB-TYPE: SNEW PERMIT NO: B06-4227
JOB ADDRESS:
10584 TOBIAS LANE
FRISCO, TX
DESC:   5243 AC, 6835 SF, SFR / 2 STORY
OWNER:
KC CUSTOM HOMES X11/07
1816 E. ABRAM
ARLINGTON TX 76010

CONTRACTOR:
KC CUSTOM HOMES X11/07
1816 E. ABRAM
ARLINGTON TX 76010
ISSUED DATE:
12/5/2006
APPLIED DATE:
11/13/2006
EXPIRED DATE:
6/3/2007
SITE APN:
STATUS:
COMPLETED
APPLICANT:
KC CUSTOM HOMES X11/07
1816 E. ABRAM
ARLINGTON TX 76010
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
394910.73
FEE SUMMARY
INSPECTION SUMMARY
LAWNSPRINKLERSYSTEM$35.00
CONVENIENCE FEE$4.50
WATER METER DEPOSIT$75.00
1 INCH METER$290.00
PLAN REVIEW FEE$50.00
RESIDENTIAL ELECTRIC FEE$205.05
MISCELLANOUS MECHANICAL FEES$175.50
MISCELLANEOUS PLUMBING FEES$319.00
BUILDING PERMIT FEE$2,468.75
FENCE FEE$20.00
THOROUGHFARE IMPACT FEE$3,602.00
WATER IMPACT FEE$1,911.00
SEWER IMPACT FEE$1,553.00
SET 1 PD METER 12/6/2006 RGH$30.00
PLUMBING TOP OU 2/27/2007$30.00
GAS PRESSURE 4/20/2007$30.00
GAS PRESSURE 4/24/2007$30.00
PLUMBING TOP OU 2/26/2007$30.00
Total Fees:$10,858.80
______  METER PAYMENT
______  SET 1 PD METER
______  SET 1 PD METER
______  T-POLE
______  PLUMBING ROUGH-IN
______  T-POLE
______  SLAB
______  CAMERA
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  BRICK/WALL TIES
______  DRY WALL
______  FLATWORK
______  GAS PRESSURE
______  GAS PRESSURE
______  GAS RELEASE
______  GAS PRESSURE
______  ELECTRICAL FINAL
______  PLUMBING ROUGH-IN
______  PLUMBING FINAL
______  PLUMBING FINAL
______  MISCCO
______  CO/BUILDING FINAL
______  UTILITY / ROW
______  UTILITY / ROW
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)