|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 11/8/2006
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B06-4160
|
JOB ADDRESS: 10618 TOBIAS LANE FRISCO, TX 75034 |
DESC:
*EXPIRED*4968 AC, 6062 SF, SFR / 2 STORY |
|
OWNER:
GEORGE C FULLER CONTRACTING X-
2405 PROVINE RD MCKINNEY TX 75070
|
CONTRACTOR:
GEORGE C FULLER CONTRACTING X-
2405 PROVINE RD MCKINNEY TX 75070
|
ISSUED DATE: 11/13/2006
APPLIED DATE:11/7/2006
EXPIRED DATE:11/11/2007
SITE APN:
STATUS:EXPIRED PERMIT
|
|
APPLICANT:
GEORGE C FULLER CONTRACTING X-
2405 PROVINE RD MCKINNEY TX 75070
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 370662.48
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
LAWNSPRINKLERSYSTEM | $35.00 |
PLUMBING ROUGH- 11/15/06 | $30.00 |
CONVENIENCE FEE | $4.80 |
CONVENIENCE FEE | $3.60 |
BRICK/WALL TIES 1/12/2007 JB | $30.00 |
BRICK/WALL TIES 1/15/2007 JB | $30.00 |
INSULATION 2/22/2007 JBS | $30.00 |
RESIDENTIAL ELECTRIC FEE | $181.86 |
MISCELLANOUS MECHANICAL FEES | $116.00 |
MISCELLANEOUS PLUMBING FEES | $302.00 |
BUILDING PERMIT FEE | $2,348.75 |
FENCE FEE | $20.00 |
THOROUGHFARE IMPACT FEE | $3,602.00 |
WATER IMPACT FEE | $1,911.00 |
SEWER IMPACT FEE | $1,553.00 |
REPLACEMENT CARD FEE | $10.00 |
CREDIT CARD FEE | $0.30 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
MISCELLANEOUS BUILDING PERMIT | $10.00 |
PLUMBING TOP OU 1/30/2007 | $30.00 |
PLUMBING TOP OU 2/6/2007 | $30.00 |
PLUMBING TOP OU 2/8/2007 | $30.00 |
T-HEAT 4/24/2007 | $30.00 |
T-HEAT 4/25/2007 | $30.00 |
Total Fees: | $10,733.31 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ T-POLE |
______ CAMERA |
______ BRICK/WALL TIES |
______ BRICK/WALL TIES |
______ MISCFRAME |
______ ELECTRICAL FINAL |
______ ELECTRICAL |
______ PLUMBING TOP OUT |
______ PLUMBING ROUGH-IN |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ LATH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ FLATWORK |
______ T-HEAT |
______ T-HEAT |
______ T-HEAT |
______ GAS RELEASE |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|