APPROVED DATE: 10/11/2006
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B06-3811
|
JOB ADDRESS: 11545 CEDAR SPRINGS DR FRISCO, TX 75035 |
DESC:
3313 AC, 4025 SF, SFR / 2 STORY |
|
OWNER:
BUESCHER HOMES
1445 MACARTHUR DR. #100 CARROLLTON TX 75007
|
CONTRACTOR:
BUESCHER HOMES
1445 MACARTHUR DR. #100 CARROLLTON TX 75007
|
ISSUED DATE: 11/14/2006
APPLIED DATE:10/2/2006
EXPIRED DATE:5/13/2007
SITE APN:C2610755
STATUS:COMPLETED
|
|
APPLICANT:
BUESCHER HOMES
1445 MACARTHUR DR. #100 CARROLLTON TX 75007
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 247182.93
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMBING FINAL 3/27/2007 | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
PLUMBING TOP OU 1/11/07 | $30.00 |
PLUMBING TOP OU 1/12/07 | $30.00 |
PLUMBING TOP OU 1/19/2007 | $30.00 |
PLUMBING TOP OU 1/23/2007 | $30.00 |
PLUMBING TOP OU 1/26/2007 | $30.00 |
SLAB 12/12/06 | $30.00 |
T-POLE 11/22/2006 JJF | $30.00 |
PLUMBING ROUGH- 11/27/06 | $30.00 |
PLUMBING ROUGH- 11/29/06 | $30.00 |
PLUMBING TOP OU 1/9/07 | $30.00 |
SET 1 PD METER 11/15/2006 RG | $30.00 |
2NDS/FRAMING 1/31/2007 WKT | $30.00 |
2NDS/FRAMING 2/13/2007 WKT | $30.00 |
INSULATION 2/19/2007 WKT | $30.00 |
INSULATION 2/22/2007 WKT | $30.00 |
DRY WALL 2/27/2007 WKT | $30.00 |
FENCE FEE | $20.00 |
BUILDING PERMIT FEE | $1,733.75 |
MISCELLANEOUS PLUMBING FEES | $211.00 |
MISCELLANOUS MECHANICAL FEES | $123.00 |
RESIDENTIAL ELECTRIC FEE | $120.75 |
Total Fees: | $3,083.50 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ FLATWORK |
______ SLAB |
______ FLATWORK |
______ SLAB |
______ CAMERA |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ DRY WALL |
______ DRY WALL |
______ BRICK/WALL TIES |
______ BRICK/WALL TIES |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|