|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 8/29/2006
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B06-3431
|
JOB ADDRESS: 954 CRYSTAL LAKE DR FRISCO, TX 75034 |
DESC:
2803 AC, 3693 SF, SFR / 2 STORY |
|
OWNER:
PULTE HOMES
1234 LAKESHORE DR, #750A COPPELL TX 75019
|
CONTRACTOR:
PULTE HOMES
1234 LAKESHORE DR, #750A COPPELL TX 75019
|
ISSUED DATE: 9/15/2006
APPLIED DATE:8/29/2006
EXPIRED DATE:3/14/2007
SITE APN:D299067
STATUS:COMPLETED
|
|
APPLICANT:
PULTE HOMES
1234 LAKESHORE DR, #750A COPPELL TX 75019
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 209131.83
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
LAWNSPRINKLERSYSTEM | $35.00 |
CAMERA FAILED | $30.00 |
CAMERA FAILED | $30.00 |
BUILDING PERMIT FEE | $1,543.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $211.00 |
MISCELLANOUS MECHANICAL FEES | $129.50 |
SEWER IMPACT FEE | $523.00 |
RESIDENTIAL ELECTRIC FEE | $110.79 |
WATER IMPACT FEE | $388.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
CAMERA FAILED | $30.00 |
PLUMBING ROUGH- 9/19/06 | $30.00 |
2NDS/FRAMING 11/10/2006 SWE | $30.00 |
2NDS/FRAMING 11/13/2006 SWE | $30.00 |
PLUMBING TOP OU 11/6/06 | $30.00 |
PLUMBING TOP OU 11/8/06 | $30.00 |
GAS RELEASE 12/4/06 | $30.00 |
PLUMBING FINAL 12/14/06 | $30.00 |
Total Fees: | $3,626.04 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ FLATWORK |
______ CAMERA |
______ CAMERA |
______ T-POLE |
______ CAMERA |
______ CAMERA |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ BRICK/WALL TIES |
______ GAS RELEASE |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|