|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 8/30/2006
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B06-3368
|
JOB ADDRESS: 1371 HAZEL GREEN DR FRISCO, TX |
DESC:
4245 AC, 4799 SF, SFR / 2 STORY |
|
OWNER:
FIRST TEXAS HOMES
2221 E LAMAR #960 ARLINGTON TX 76006
|
CONTRACTOR:
FIRST TEXAS HOMES
2221 E LAMAR #960 ARLINGTON TX 76006
|
ISSUED DATE: 9/7/2006
APPLIED DATE:8/22/2006
EXPIRED DATE:3/6/2007
SITE APN:D299537
STATUS:COMPLETED
|
|
APPLICANT:
FIRST TEXAS HOMES
2221 E LAMAR #960 ARLINGTON TX 76006
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 316719.45
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
LAWNSPRINKLERSYSTEM | $35.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
RESIDENTIAL ELECTRIC FEE | $143.97 |
MISCELLANOUS MECHANICAL FEES | $123.00 |
MISCELLANEOUS PLUMBING FEES | $239.00 |
BUILDING PERMIT FEE | $2,078.75 |
FENCE FEE | $20.00 |
RESIDENTIAL RED TAG FEE | $30.00 |
UTILITY / ROW 1/10/2007 KB | $30.00 |
THOROUGHFARE IMPACT FEE | $2,242.00 |
WATER IMPACT FEE | $388.00 |
SEWER IMPACT FEE | $523.00 |
2NDS/FRAMING 10/27/06 | $30.00 |
BRICK 11/21/06 | $30.00 |
DRY WALL 11/16/2006 RC | $30.00 |
WATER USAGE ON NON FUNCTIONAL | $500.00 |
Total Fees: | $6,807.72 |
|
|
| ______ METER PAYMENT |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ SLAB |
______ CAMERA |
______ PLUMBING TOP OUT |
______ FLATWORK |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ BRICK |
______ BRICK |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ WATER REGISTER |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|