Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 8/17/2006 PERMIT SUB-TYPE: SNEW PERMIT NO: B06-3249
JOB ADDRESS:
1786 HILTON HEAD LN
FRISCO, TX 75034
DESC:   5988 AC, 7269 SF, SFR / 2 STORY
OWNER:
MERCEDES CONSTRUCTION INC. -
8801 COUNTRY GLEN CROSSING
PLANO TX 75024

CONTRACTOR:
MERCEDES CONSTRUCTION INC. -
8801 COUNTRY GLEN CROSSING
PLANO TX 75024
ISSUED DATE:
8/25/2006
APPLIED DATE:
8/14/2006
EXPIRED DATE:
2/24/2007
SITE APN:
D239902
STATUS:
COMPLETED
APPLICANT:
MERCEDES CONSTRUCTION INC. -
8801 COUNTRY GLEN CROSSING
PLANO TX 75024
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
446764.68
FEE SUMMARY
INSPECTION SUMMARY
CREDIT CARD FEE$2.70
CREDIT CARD FEE$1.80
T-POLE 9/5/06$25.00
CREDIT CARD FEE$3.60
PLUMBING FINAL 9/25/2007 CK$30.00
CO/BUILDING FINAL 10/11/2007$30.00
CO/BUILDING FINAL 10/18/2007$30.00
2NDS/FRAMING 2/1/2007 CW$30.00
2NDS/FRAMING 2/6/2007 CW$30.00
2NDS/FRAMING 1/26/2007$30.00
PLUMBING TOP OU 1/24/2007$30.00
WATER METER DEPOSIT$75.00
1 INCH METER$290.00
ELECTRICAL FINAL 9/25/2007 J$30.00
T-POLE 9/5/06$5.00
UTILITY / ROW 10/4/2007 KB$30.00
WATER USAGE ON NON FUNCTIONAL$500.00
RESIDENTIAL RED TAG FEE$30.00
PLUMBING TOP OUT 1/17/2007 M$30.00
ELECTRICAL FINAL 9/21/2007 R$30.00
SET 1 PD METER 9/7/2006 RGH$30.00
PLUMBING TOP OU 1/12/07$30.00
RESIDENTIAL ELECTRIC FEE$218.07
MISCELLANOUS MECHANICAL FEES$202.00
MISCELLANEOUS PLUMBING FEES$233.00
BUILDING PERMIT FEE$2,728.75
FENCE FEE$20.00
PLAN REVIEW FEE$50.00
Total Fees:$4,774.92
______  METER PAYMENT
______  T-POLE
______  SET 1 PD METER
______  T-POLE
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  SLAB
______  CAMERA
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  DRY WALL
______  BRICK
______  FLATWORK
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  UTILITY / ROW
______  WATER REGISTER
______  UTILITY / ROW
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)