|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 7/14/2006
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B06-2798
|
JOB ADDRESS: 6504 LINCOLN HILLS CT FRISCO, TX 75034 |
DESC:
2240 AC, 3174 SQ FT, SFR / 1 STORY |
|
OWNER:
PULTE HOMES
1234 LAKESHORE DR, #750A COPPELL TX 75019
|
CONTRACTOR:
PULTE HOMES
1234 LAKESHORE DR, #750A COPPELL TX 75019
|
ISSUED DATE: 7/17/2006
APPLIED DATE:7/14/2006
EXPIRED DATE:
SITE APN:D298021
STATUS:COMPLETED
|
|
APPLICANT:
PULTE HOMES
1234 LAKESHORE DR, #750A COPPELL TX 75019
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 167126.4
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
RESIDENTIAL RED TAG FEE | $30.00 |
CO/BUILDING FINAL 1/11/2007 | $30.00 |
UTILITY / ROW 1/3/2007 KB | $30.00 |
DRY WALL 11/14/2006 SWE | $30.00 |
FLATWORK 11/28/2006 SWE | $30.00 |
FLATWORK 11/29/2006 SWE | $30.00 |
FLATWORK 12/4/2006 SWE | $30.00 |
PLUMBING FINAL 12/28/06 | $30.00 |
PLUMBING FINAL 1/4/07 | $30.00 |
ELECTRICAL FINA 12/14/06 | $30.00 |
1 INCH METER | $290.00 |
WATER METER DEPOSIT | $75.00 |
WATER IMPACT FEE | $388.00 |
SEWER IMPACT FEE | $523.00 |
RESIDENTIAL ELECTRIC FEE | $95.22 |
MISCELLANOUS MECHANICAL FEES | $96.50 |
MISCELLANEOUS PLUMBING FEES | $195.00 |
FENCE FEE | $20.00 |
BUILDING PERMIT FEE | $1,333.75 |
LAWNSPRINKLERSYSTEM | $35.00 |
Total Fees: | $3,351.47 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ T-POLE |
______ T-POLE |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ BRICK/WALL TIES |
______ DRY WALL |
______ DRY WALL |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|