|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 7/11/2006
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B06-2658
|
JOB ADDRESS: 1308 HAZEL GREEN DR FRISCO, TX |
DESC:
3553 AC, 3983 SF, SFR / 2 STORY |
|
OWNER:
FIRST TEXAS HOMES
2221 E LAMAR #960 ARLINGTON TX 76006
|
CONTRACTOR:
FIRST TEXAS HOMES
2221 E LAMAR #960 ARLINGTON TX 76006
|
ISSUED DATE: 7/17/2006
APPLIED DATE:7/5/2006
EXPIRED DATE:1/16/2007
SITE APN:D299578
STATUS:COMPLETED
|
|
APPLICANT:
FIRST TEXAS HOMES
2221 E LAMAR #960 ARLINGTON TX 76006
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 265089.33
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
RESIDENTIAL RED TAG FEE | $30.00 |
RESIDENTIAL RED TAG FEE | $30.00 |
PLUMBING FINAL 11/15/06 | $30.00 |
PLUMBING FINAL 11/20/06 | $30.00 |
THOROUGHFARE IMPACT FEE | $2,242.00 |
WATER IMPACT FEE | $388.00 |
SEWER IMPACT FEE | $523.00 |
RESIDENTIAL RED TAG FEE | $30.00 |
RESIDENTIAL RED TAG FEE | $30.00 |
RESIDENTIAL RED TAG FEE | $30.00 |
FLATWORK 11/10/2006 RC | $30.00 |
PLUMBING TOP OU 8/31/06 | $30.00 |
RESIDENTIAL RED TAG FEE | $30.00 |
RESIDENTIAL RED TAG FEE | $30.00 |
SET 1 PD METER 7/21/2006 RGH | $30.00 |
FENCE FEE | $20.00 |
BUILDING PERMIT FEE | $1,823.75 |
MISCELLANEOUS PLUMBING FEES | $232.00 |
MISCELLANOUS MECHANICAL FEES | $123.00 |
RESIDENTIAL ELECTRIC FEE | $119.49 |
LAWNSPRINKLERSYSTEM | $35.00 |
1 INCH METER | $290.00 |
WATER METER DEPOSIT | $75.00 |
Total Fees: | $6,231.24 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ T-POLE |
______ SLAB |
______ CAMERA |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ DRY WALL |
______ BRICK/WALL TIES |
______ DRY WALL |
______ DRY WALL |
______ ELECTRICAL FINAL |
______ FLATWORK |
______ PLUMBING FINAL |
______ FLATWORK |
______ FLATWORK |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|