BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 6/25/2006
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B06-2580
|
JOB ADDRESS: 6624 LINCOLN HILLS CT FRISCO, TX 75034 |
DESC:
3006 AC, 3692 SQ FT, SFR / 1 STORY |
|
OWNER:
PULTE HOMES
1234 LAKESHORE DR, #750A COPPELL TX 75019
|
CONTRACTOR:
PULTE HOMES
1234 LAKESHORE DR, #750A COPPELL TX 75019
|
ISSUED DATE: 6/28/2006
APPLIED DATE:6/25/2006
EXPIRED DATE:12/27/2006
SITE APN:D298016
STATUS:COMPLETED
|
|
APPLICANT:
PULTE HOMES
1234 LAKESHORE DR, #750A COPPELL TX 75019
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 224277.66
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
LAWNSPRINKLERSYSTEM | $35.00 |
ELECTRICAL FINAL 11/3/2006 C | $30.00 |
RESIDENTIAL RED TAG FEE | $30.00 |
WATER USAGE ON NON FUNCTIONAL | $500.00 |
PLUMBING FINAL 11/10/06 | $30.00 |
PLUMBING FINAL 11/8/2006 TRC | $30.00 |
CO/BUILDING FIN 11/22/06 | $30.00 |
CO/BUILDING FIN 11/20/06 | $30.00 |
UTILITY / ROW 11/7/2006 KB | $30.00 |
MISCELLANOUS MECHANICAL FEES | $129.50 |
MISCELLANEOUS PLUMBING FEES | $216.00 |
FENCE FEE | $20.00 |
BUILDING PERMIT FEE | $1,618.75 |
WATER IMPACT FEE | $388.00 |
SEWER IMPACT FEE | $523.00 |
RESIDENTIAL ELECTRIC FEE | $110.76 |
PLUMBING FINAL 11/13/06 | $30.00 |
1 CURBSTOP REPAIR / REPLACE | $150.00 |
1 INCH METER | $290.00 |
WATER METER DEPOSIT | $75.00 |
Total Fees: | $4,296.01 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING TOP OUT |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ WATER REGISTER |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|