|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 7/12/2006
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B06-2481
|
JOB ADDRESS: 9878 RANCHERO DR FRISCO, TX 75034 |
DESC:
4139 AC, 4857 SF, SFR / 2 STORY |
|
OWNER:
DARLING HOMES - X 8/07
2500 LEGACY STE # 100 FRISCO TX 75034
|
CONTRACTOR:
DARLING HOMES - X 8/07
2500 LEGACY STE # 100 FRISCO TX 75034
|
ISSUED DATE: 7/13/2006
APPLIED DATE:7/11/2006
EXPIRED DATE:
SITE APN:D264919
STATUS:COMPLETED
|
|
APPLICANT:
DARLING HOMES - X 8/07
2500 LEGACY STE # 100 FRISCO TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 308810.79
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
PLUMBING TOP OU 9/7/06 | $30.00 |
PLUMBING TOP OU 9/8/06 | $30.00 |
RESIDENTIAL RED TAG FEE | $30.00 |
PLAN REVIEW FEE | $50.00 |
RESIDENTIAL ELECTRIC FEE | $145.71 |
MISCELLANOUS MECHANICAL FEES | $142.50 |
MISCELLANEOUS PLUMBING FEES | $267.00 |
BUILDING PERMIT FEE | $2,038.75 |
FENCE FEE | $20.00 |
RESIDENTIAL RED TAG FEE | $30.00 |
SET 1 PD METER 7/17/2006 RGH | $30.00 |
ELECTRICAL FINAL 11/6/2006 W | $30.00 |
ELECTRICAL FINAL 11/8/2006 W | $30.00 |
Total Fees: | $3,238.96 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ FLATWORK |
______ CAMERA |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|