APPROVED DATE: 6/15/2006
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B06-2223
|
JOB ADDRESS: 11962 STEPHENVILLE DR FRISCO, TX 75035 |
DESC:
2640 AC, 3364 SF, SFR / 2 STORY |
|
OWNER:
BUESCHER HOMES
1445 MACARTHUR DR. #100 CARROLLTON TX 75007
|
CONTRACTOR:
BUESCHER HOMES
1445 MACARTHUR DR. #100 CARROLLTON TX 75007
|
ISSUED DATE: 6/22/2006
APPLIED DATE:6/2/2006
EXPIRED DATE:12/21/2006
SITE APN:C2554382
STATUS:COMPLETED
|
|
APPLICANT:
BUESCHER HOMES
1445 MACARTHUR DR. #100 CARROLLTON TX 75007
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 196970.4
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
LAWNSPRINKLERSYSTEM | $35.00 |
PLUMBING TOP OU 8/7/06 | $30.00 |
PLUMBING TOP OU 8/9/06 | $30.00 |
PLUMBING TOP OU 8/14/06 | $30.00 |
CONVENIENCE FEE | $4.50 |
CONVENIENCE FEE | $0.90 |
RESIDENTIAL RED TAG FEE | $30.00 |
RESIDENTIAL RED TAG FEE | $30.00 |
RESIDENTIAL RED TAG FEE | $30.00 |
UTILITY / ROW 10/23/2006 KB | $30.00 |
PLUMBING FINAL 10/6/06 | $30.00 |
PLUMBING FINAL 10/9/06 | $30.00 |
PLUMBING FINAL 10/11/06 | $30.00 |
PLUMBING FINAL 10/19/06 | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
RESIDENTIAL RED TAG FEE | $30.00 |
RESIDENTIAL RED TAG FEE | $30.00 |
RESIDENTIAL ELECTRIC FEE | $100.92 |
MISCELLANOUS MECHANICAL FEES | $129.50 |
MISCELLANEOUS PLUMBING FEES | $211.00 |
BUILDING PERMIT FEE | $1,478.75 |
FENCE FEE | $20.00 |
Total Fees: | $2,735.57 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ FLATWORK |
______ CAMERA |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ BRICK/WALL TIES |
______ BRICK/WALL TIES |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ GAS RELEASE |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|